One of 2 filings for this project. The project's main page, with every filing and where each stands: Underground Cable Laying for Transmission of Power Line From Solar Plant to Existing Plant
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Jul 2024 |
| Application filed | 5 Apr 2024 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Power |
| Applicant | M/S Dalmia Cement (Bharat) Limited, Unit: Bengal Cement Works |
| Land area | 200 m² |
| Forest land | 150 m² |
| Project cost | ₹6 lakh |
| Village / locality | Kulapachuria |
| Taluk / tehsil | Salbani |
| District | Medinipur West |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02111 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 May 2024 | Lapsed | 0 acres | ₹6 lakh |
| Change of use filed 5 Apr 2024 (this page) | Lapsed | 0 acres | ₹6 lakh |
In context
11 applications in Medinipur West since January 2022 are in the same category (Power): 2 approved, 5 filed or under review, and 4 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
Where it is
Kulapachuria, Salbani, Medinipur West, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Underground Cable Laying for Transmission of Power Line From Solar Plant to… — lapsed, 0 m away
- Halder Environmental Controlled Farm — under forest review, 6.4 km away
- Expansion of Coal Based Ultra Super Critical Thermal Power Plant from 1600 MW… — under environmental review, 6.5 km away
- Expansion of Coal Based Ultra Super Critical Thermal Power Plant from 1600 MW… — withdrawn, 6.5 km away
- Integrated Farming — not approved, 10.7 km away
- Connecting Road for 2nd Campus of Saraswati Shishu Mandir at Mouza Nandagari… — under forest review, 10.9 km away
- Gumriyapal Sand Mine — cleared for impact study, 14.5 km away
- Lohatikri Sand Mine (MSB-2) — under environmental review, 16.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.