Quick answers
What is this project?
SANKISOL Stand Alone Units For Drought Like Situation Prone 8 Blocks Of Jhargram District (Model Stand Alone Grid Power Operated Water Supply System For Habitations / Mouzas With 400 & More Population) Under Mid-Term Plan Of Master Plan is a lapsed water and irrigation project in Sanki Sol, Jamboni, Jhargram, West Bengal. The site covers 189.3 acres.
Who is building it?
The applicant is Rural Development.
Has it been approved?
No. The application was lapsed on 20 Aug 2024, so it is no longer under consideration.
Where is it?
In Sanki Sol, Jamboni, Jhargram, West Bengal.
How big is it?
It has a stated cost of ₹18 lakh; a site of 189.3 acres and 1,970 m² of forest land.
When was it filed?
The application was filed on 15 Dec 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 20 Aug 2024 |
| Application filed | 15 Dec 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | Rural Development |
| Land area | 189.3 acres (76.6 ha) |
| Forest land | 1,970 m² |
| Project cost | ₹18 lakh |
| Village / locality | Sanki Sol |
| Taluk / tehsil | Jamboni |
| District | Jhargram |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02117 |
In context
45 applications in Jhargram since January 2022 are in the same category (Water & irrigation): 0 approved, 0 filed or under review, and 45 withdrawn, lapsed or rejected. At 189.3 acres, this one is smaller than 89% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sanki Sol, Jamboni, Jhargram, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bara Rajgram Stand Alone Units For Drought Like Situation Prone 8 Blocks Of… — lapsed, 1.2 km away
- Baghakhondar Stand Alone Units For Drought Like Situation Prone 8 Blocks Of… — lapsed, 1.8 km away
- Diversion of Forest Land for Construction of "new Bg Railway Line Between… — under forest review, 2.7 km away
- Barasol Standalone Scheme — lapsed, 3 km away
- road from Jamboni BDO office to Lalbandh PMGSY — lapsed, 6.2 km away
- Construction of Road from Jamboni BDO Office to Lalbandh PMGSY Road — lapsed, 6.3 km away
- Khatgeria AND ADJOINING MOUJAS PWSS — lapsed, 8.2 km away
- Drawal of New 11 KV Kapgari Feeder — lapsed, 11.8 km away
More from Rural Development in Jhargram
- Jamui Stand Alone Units For Drought Like Situation Prone 8 Blocks Of Jhargram… — lapsed
- Baghakhondar Stand Alone Units For Drought Like Situation Prone 8 Blocks Of… — lapsed
- Dalkati and Adjoining Moujas Pwss(Sm/12357) — lapsed
- Jamui Stand Alone Units For Drought Like Situation Prone 8 Blocks Of Jhargram… — lapsed
- Pindrakuli and Adjoining Moujas Pwss — lapsed
- Khatgeria AND ADJOINING MOUJAS PWSS — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.