Project details
| Official title | 4G Saturation Project in Uncovered Village Peshok Road (Tista Bazar B.I.F) |
|---|---|
| Status | Forest land use approved |
| Status since | 24 Apr 2026 |
| Application filed | 17 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Teesta Valley Forest |
| Taluk / tehsil | Rangli Rangliot |
| District | Darjiling |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02130 |
In context
20 applications in Darjiling since January 2022 are in the same category (Telecom): 5 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 16 months from filing to approval. At 0 acres, this one is smaller than 95% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Teesta Valley Forest, Rangli Rangliot, Darjiling, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Diversion of 0.0672 Hectares of Forest Land Under Jal Jeevan Mission… — forest land use approved, 3.3 km away
- Name of Work: Water Supply Scheme Tukdah Lapchu Khasmal & Lapchu Tea Garden… — more information requested, 7 km away
- Gravity Based Water Supply Scheme For Pubong Thulokhola under JAL JEEWAN… — decision issued, 12.4 km away
- Gravity Based Water Supply Scheme For Pubong Thulokhola under JAL JEEWAN… — forest land use approved, 12.4 km away
- 0.716 Ha Forest Land for temporary use under Kurseong Forest Div. in… — approval revoked, 13.3 km away
- 0.608 Ha Forest Land for temporary use under Kurseong Forest Div. in… — lapsed, 13.8 km away
- Additional Work for Surface Water Based for Mangpuu Cinchona Plantation Piped… — lapsed, 13.9 km away
- Water Supply Scheme for Tukdah, Lapchu,Khasmal & Lapchu Tea Garden Piped Water… — more information requested, 13.9 km away
More from Mahesh Nair in Darjiling
- ADSS OFC Laying of 4.5Km for BOP Meghma- BOP Lameyadhura route to provide… — initial checks
- ADSS OFC Laying of 5.88Km for Lameyadhura-Poolkhola route to provide backhaul… — more information requested
- Proposal for Tower construction under BOP/BIP Project at Moley BOP camp (36 BN) — under wildlife review
- Proposal for Tower construction under BOP/BIP Project at Batasey Camp (36… — under wildlife review
- Proposal for Tower construction under BOP/BIP Project at Tumbling Fatak (36 BN) — under wildlife review
- Proposal for Tower construction under BOP/BIP Project at Kalapokhari BOP camp… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.