Quick answers
What is Forest Land Using for Optical Fiber Cable Laying?
Forest Land Using for Optical Fiber Cable Laying is a lapsed telecom project in Purbba Khairbari, Madarihat, Alipurduar, West Bengal. The site covers 0.4 acres.
Who is building it?
The applicant is Telesonic Network LTD..
Has it been approved?
No. The application was lapsed on 16 Apr 2026, so it is no longer under consideration.
Where is it?
In Purbba Khairbari, Madarihat, Alipurduar, West Bengal.
How big is it?
It has a stated cost of ₹13 lakh; a site of 0.4 acres and 1,840 m² of forest land.
When was it filed?
The application was filed on 1 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Apr 2026 |
| Application filed | 1 Dec 2022 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Telesonic Network LTD. |
| Land area | 1,800 m² |
| Forest land | 1,840 m² |
| Project cost | ₹13 lakh |
| Village / locality | Purbba Khairbari |
| Taluk / tehsil | Madarihat |
| District | Alipurduar |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02235 |
In context
42 applications in Alipurduar since January 2022 are in the same category (Telecom): 5 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0.4 acres, this one is larger than 93% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Purbba Khairbari, Madarihat, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel… — forest land use approved, 0 m away
- The diversion of forest land for Laying Optical Fiber Cable of Bharti Airtel… — decision issued, 0 m away
- Ofc Cable Laying Under Jaldhaka Wildlife Forest and Proposal of Ofc Laying on… — lapsed, 0 m away
- Detailed Project Report of Proposed Sankosh-Teesta-Ganga (S-T-G) Link Project — more information requested, 5 km away
- Army Brigade Headquarter and Allied Units at Hasimara Military Station — application filed, 5.5 km away
- Army Brigade Headquarters and Allied Units at Hasimara Military Station — under wildlife review, 6.5 km away
- 4g Saturation Project in Uncovered Village Dumchi Rava — lapsed, 8 km away
- The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel… — lapsed, 8.7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.