What is Developing? Open the mapMap

LapsedTelecom · Alipurduar, West Bengal

The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project at Wildlife Division Coochbehar. It's Along the National Highway 317 at Kodal Basti Range From Near Smashan Ghat to Near Bariyajoda Bridge and Total Length Is 1.1 Km. in Hectare 0.132 Ha

The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project at Wildlife Division Coochbehar. It's Along the National Highway 317 at Kodal Basti Range From Near Smashan Ghat to Near Bariyajoda Bridge and Total Length Is 1.1 Km. in Hectare 0.132 Ha is a lapsed telecom project in Uttar Barajhar Forest, Kalchini, Alipurduar, West Bengal. The site covers 0 acres. Its stated project cost is ₹3 lakh. As of 27 Nov 2026, its status is “Lapsed” (since 23 Aug 2025).

See it on the live map All projects in Alipurduar

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project at Wildlife Division Coochbehar. It's Along the National Highway 317 at Kodal Basti Range From Near Smashan Ghat to Near Bariyajoda Bridge and Total Length Is 1.1 Km. in Hectare 0.132 Ha is a lapsed telecom project in Uttar Barajhar Forest, Kalchini, Alipurduar, West Bengal. The site covers 0 acres.

Who is building it?

The applicant is Bharti Airtel Limited.

Has it been approved?

No. The application was lapsed on 23 Aug 2025, so it is no longer under consideration.

Where is it?

In Uttar Barajhar Forest, Kalchini, Alipurduar, West Bengal.

How big is it?

It has a stated cost of ₹3 lakh; a site of 0 acres and 440 m² of forest land.

When was it filed?

The application was filed on 20 Oct 2024.

One of 2 filings for this project. The project's main page, with every filing and where each stands: The Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project…

Project details

Official titleProposal for the Diversion of Forest Land for Laying Optical Fiber Cable of Bharti Airtel LTD Project at Wildlife Division Coochbehar. It's Along the National Highway 317 at Kodal Basti Range From Near Smashan Ghat to Near Bariyajoda Bridge and Total Length Is 1.1 Km. in Hectare 0.132 Ha.
StatusLapsed
Status since23 Aug 2025
Application filed20 Oct 2024
Approval soughtForest land use
Application typeNew project
SectorTelecom
ApplicantBharti Airtel Limited
Land area200 m²
Forest land440 m²
Project cost₹3 lakh
Village / localityUttar Barajhar Forest
Taluk / tehsilKalchini
DistrictAlipurduar
StateWest Bengal
Location fromSite boundary on record
Our referenceWID-WB-02306

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 20 Oct 2024 (this page)Lapsed0 acres₹3 lakh
New project filed 18 Dec 2023Decision issued0 acres₹3 lakh

In context

42 applications in Alipurduar since January 2022 are in the same category (Telecom): 5 approved, 8 filed or under review, and 23 withdrawn, lapsed or rejected. The approved ones took a median of 21 months from filing to approval. At 0 acres, this one is smaller than 100% of them.

9 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Uttar Barajhar Forest, Kalchini, Alipurduar, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Bharti Airtel Limited in Alipurduar

8 Bharti Airtel (Airtel) projects in Alipurduar
All 485 Bharti Airtel (Airtel) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.