Project details
| Status | Initial checks |
|---|---|
| Status since | 19 Nov 2026 |
| Application filed | 18 Nov 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Industry |
| Applicant | Spintech Tubes Private Limited |
| Land area | 234.3 acres (94.8 ha) |
| Forest land | 2.3 acres (0.9 ha) |
| Project cost | ₹4,600 crore |
| Village / locality | Mamudpur |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02285 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 234.3 acres, this one is larger than 85% of them.
69 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mamudpur, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Application of "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks, 50 m away
- Diversion of 2.66 Ha of Forest Land by SPINTECH TUBES PRIVATE LIMITED — withdrawn, 550 m away
- Proposed Integrated Steel Plant — environmental approval granted, 950 m away
- Proposed Expansion cum modification of existing steel plant by capacity… — lapsed, 950 m away
- Proposed Expansion cum modification of existing steel plant by capacity… — cleared for impact study, 950 m away
- Shyam Sel and Power Limited, Jamuria "No Increase in Pollution Load for… — initial checks, 950 m away
- "No Increase in Pollution Load" Certificate for Increasing of Production… — initial checks, 1000 m away
- Application for "No Increase in Pollution Load" Certificate for Change in… — initial checks, 1 km away
More from Spintech Tubes Private Limited in Paschim Bardhaman
- Application of "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks
- Diversion of 2.66 Ha of Forest Land by SPINTECH TUBES PRIVATE LIMITED — withdrawn
- Diversion of 0.92 Ha of Forest Land by SPINTECH TUBES PRIVATE LIMITED — withdrawn
All 4 Spintech Tubes projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.