Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Sept 2026 |
| Application filed | 11 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Industry |
| Applicant | Shyam Sel & Power Limited |
| Land area | 643 acres (260.2 ha) |
| Project cost | ₹1,987.4 crore |
| Village / locality | Dhasna |
| Taluk / tehsil | Jamuria |
| District | Paschim Bardhaman |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-01648 |
In context
169 applications in Paschim Bardhaman since January 2022 are in the same category (Industry): 81 approved, 49 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 643 acres, this one is larger than 94% of them.
69 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Dhasna, Jamuria, Paschim Bardhaman, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "No Increase in Pollution Load" Certificate for Increasing of Production… — initial checks, 150 m away
- Shyam Sel and Power Limited, Jamuria "No Increase in Pollution Load for… — initial checks, 150 m away
- Application for "No Increase in Pollution Load" Certificate for Change in… — initial checks, 250 m away
- Diversion of 2.66 Ha of Forest Land by SPINTECH TUBES PRIVATE LIMITED — withdrawn, 600 m away
- Application of "No Increase in Pollution Load" Certificate for Change in Raw… — initial checks, 900 m away
- Forest Diversion Proposal of 0.92 Ha of Forest Land by Spintech Tubes Private… — initial checks, 950 m away
- Diversion of 0.92 Ha of Forest Land by SPINTECH TUBES PRIVATE LIMITED — withdrawn, 1 km away
- Proposed Steel Plant (Green-Field Project) by installation of 2x650 TPD DRI… — under environmental review, 1.4 km away
More from Shyam Sel & Power Limited in Paschim Bardhaman
- Transfer of Environmental Clearance for 5,88,800 Tpa Cold Rolling Mill Complex… — under environmental review
- "No Increase in Pollution Load" Certificate for Increasing of Production… — initial checks
- Industrial project by Shyam SEL and Power Limited — more information requested
- Industrial project by Shyam Sel and Power Limited — more information requested
- Proposed Expansion cum modification of Existing Steel Plant — returned to applicant
- Proposed Expansion cum modification of Existing Steel Plant — lapsed
9 Shyam Sel & Power projects in Paschim Bardhaman
All 16 Shyam Sel & Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.