Project details
| Status | Decision issued |
|---|---|
| Status since | 21 Aug 2023 |
| Application filed | 21 Aug 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Water & irrigation |
| Applicant | West Bengal Public Health Engineering Directorate |
| Land area | 1,100 m² |
| Project cost | ₹3.5 crore |
| Village / locality | Kumai Khasmehal |
| Taluk / tehsil | Gorubathan |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02440 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 3 Apr 2024 | More information requested | 0.3 acres | ₹3.5 crore |
| New project filed 21 Aug 2023 (this page) | Decision issued | 0.3 acres | ₹3.5 crore |
In context
75 applications in Kalimpong since January 2022 are in the same category (Water & irrigation): 9 approved, 41 filed or under review, and 18 withdrawn, lapsed or rejected. The approved ones took a median of 19 months from filing to approval. At 0.3 acres, this one is larger than 74% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kumai Khasmehal, Gorubathan, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 0.1128 Ha Land to Be Diverted Creating Gravity Based Piped Water… — more information requested, 0 m away
- Proposed 0.01468 Ha Land to Be Diverted Creating Gravity Based Piped Water… — decision issued, 1000 m away
- Proposed 0.01468 Ha Land to Be Diverted Creating Gravity Based Piped Water… — more information requested, 1000 m away
- 4G Saturation Project in Uncovered Village KITAPSI — more information requested, 3.5 km away
- Proposed 0.00242 Ha Land to Be Diverted for Piped Water Supply Scheme From… — more information requested, 3.8 km away
- Proposed 0.0192 Ha Land to Be Diverted Piped Water Supply Scheme From Chip… — more information requested, 4.6 km away
- Upper Neora Shp (6 MW) — under forest review, 5.1 km away
- Proposed 0.06793 Ha Land to Be Diverted for Creating Gravity Based Piped Water… — more information requested, 5.2 km away
More from West Bengal Public Health Engineering Directorate in Kalimpong
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for 1… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for 16th… — lapsed
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — under wildlife review
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for 1… — under wildlife review
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.