Project details
| Status | More information requested |
|---|---|
| Status since | 3 Nov 2026 |
| Application filed | 3 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Rango Forest |
| Taluk / tehsil | Gorubathan |
| District | Kalimpong |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02140 |
In context
19 applications in Kalimpong since January 2022 are in the same category (Telecom): 8 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0 acres, this one is smaller than 82% of them.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rango Forest, Gorubathan, Kalimpong, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed 0.0192 Ha Land to Be Diverted Piped Water Supply Scheme From Chip… — more information requested, 1.2 km away
- Proposed 0.00242 Ha Land to Be Diverted for Piped Water Supply Scheme From… — more information requested, 2.2 km away
- Jal Jeevan Misison (Jjm) Scheme for Gravity Based Water Supply Scheme for… — lapsed, 2.7 km away
- 4G Saturation Project — forest land use approved, 2.9 km away
- Proposed 0.1128 Ha Land to Be Diverted Creating Gravity Based Piped Water… — more information requested, 3.5 km away
- Proposed 0.1128 Ha Land to Be Diverted Creating Gravity Based Piped Water… — decision issued, 3.5 km away
- 4G Saturation Project in Uncovered Village DALGAON — more information requested, 3.6 km away
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested, 4.1 km away
More from Mahesh Nair in Kalimpong
- 4G Saturation Project in Uncovered Village DALGAON — more information requested
- 4G Saturation Project in Uncovered Village Paren Forest — more information requested
- ADSS OFC Laying of 18.433 Km under 4G Saturation DBN Funded Project of GOI — more information requested
- 4G saturation Project in uncovered village Mangpong Forest — forest land use approved
- 4G Saturation Project — forest land use approved
- 4G Saturation Project in uncovered village Lish Forest — forest land use approved