Quick answers
What is this project?
Expansion of Fertilizer Plant located at Durgachak, Haldia, Purba Medinipur, PO+PS- Durgachak, West Bengal by M/s Indorama India Pvt. Ltd is a proposed industrial project in Durga Chak, Haldia, Purba Medinipur, West Bengal. The site covers 80 acres.
Who is building it?
The applicant is Indorama India Private Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Durga Chak, Haldia, Purba Medinipur, West Bengal.
How big is it?
It has a stated cost of ₹5.5 crore and a site of 80 acres.
When was it filed?
The application was filed on 3 Nov 2026.
Project details
| Status | More information requested |
|---|---|
| Status since | 16 Nov 2026 |
| Application filed | 3 Nov 2026 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Industry |
| Applicant | Indorama India Private Limited |
| Land area | 80 acres (32.4 ha) |
| Project cost | ₹5.5 crore |
| Village / locality | Durga Chak |
| Taluk / tehsil | Haldia |
| District | Purba Medinipur |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02550 |
In context
27 applications in Purba Medinipur since January 2022 are in the same category (Industry): 12 approved, 11 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 80 acres, this one is larger than 67% of them.
27 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Durga Chak, Haldia, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 3.2 Km Stretch From Hall to Haldia Terminal for the Proposed Haldia-Panagarh… — coastal clearance granted, 600 m away
- Environmental Clearance transfer from M/s UPL Limited Unit 09 to M/s Superform… — environmental approval granted, 1.1 km away
- Change in product mix with No Increase in Pollution Load under Para 7 ii (b)… — initial checks, 1.1 km away
- Change in product mix with No Increase in Pollution Load under Para 7 ii (b)… — initial checks, 1.1 km away
- Proposed Expansion of UPL Limited - Haldia Manufacturing Unit — environmental approval granted, 1.1 km away
- Proposed Expansion of UPL Limited - Haldia Manufacturing Unit — cleared for impact study, 1.1 km away
- Ferro-Alloy Plant (SAF 4x9 MVA) and Chrome Ore Briquetting Plant (2x10 TPH) at… — returned to applicant, 2.8 km away
- Ferro-Alloy Plant (SAF 4x9 MVA) and Chrome Ore Briquetting Plant (2x10 TPH) at… — cleared for impact study, 2.8 km away
All 4 Indorama projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.