Quick answers
What is this project?
3.2 Km Stretch From Hall to Haldia Terminal for the Proposed Haldia-Panagarh Lpg Pipeline With 1.45 Mmtpa Capacity is an approved pipeline project in Brindaban Chak, Sutahata, Purba Medinipur, West Bengal.
Who is building it?
The applicant is Ravi Megavath.
Has it been approved?
Yes. Its status is “Coastal clearance granted” (since 26 Apr 2024), as of 27 Nov 2026.
Where is it?
In Brindaban Chak, Sutahata, Purba Medinipur, West Bengal.
How big is it?
It has a stated cost of ₹1,010 crore.
When was it filed?
The application was filed on 19 Dec 2023.
Project details
| Status | Coastal clearance granted |
|---|---|
| Status since | 26 Apr 2024 |
| Application filed | 19 Dec 2023 |
| Approval sought | Coastal review |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Ravi Megavath |
| Project cost | ₹1,010 crore |
| Village / locality | Brindaban Chak |
| Taluk / tehsil | Sutahata |
| District | Purba Medinipur |
| State | West Bengal |
| Location from | Site boundary on record |
| Our reference | WID-WB-02529 |
In context
25 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Brindaban Chak, Sutahata, Purba Medinipur, West Bengal. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of Fertilizer Plant located at Durgachak, Haldia, Purba Medinipur,… — more information requested, 600 m away
- Environmental Clearance transfer from M/s UPL Limited Unit 09 to M/s Superform… — environmental approval granted, 1.7 km away
- Change in product mix with No Increase in Pollution Load under Para 7 ii (b)… — initial checks, 1.7 km away
- Change in product mix with No Increase in Pollution Load under Para 7 ii (b)… — initial checks, 1.7 km away
- Proposed Expansion of UPL Limited - Haldia Manufacturing Unit — environmental approval granted, 1.7 km away
- Proposed Expansion of UPL Limited - Haldia Manufacturing Unit — cleared for impact study, 1.7 km away
- Proposed Expansion of Existing Plant by Increasing the Production Capacity of… — environmental approval granted, 3.2 km away
- Proposed Expansion of Existing Plant by Increasing the Production Capacity of… — returned to applicant, 3.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.