Msp Steel and Power upcoming projects

Msp Steel and Power Limited has filed 7 projects for environmental, forest, wildlife or coastal approval since January 2022: 1 approved and 5 awaiting a decision. They are in Raigarh, covering 1,938.6 acres with a stated cost of ₹15,779.3 crore. The latest was filed on 17 Sept 2026.

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

7projects filed
5awaiting approval
1districts

All 7 projects, newest first

ProjectTypeSizeStatusFiled
No Increase in Pollution Load (NIPL) para 7(ii)c provisions under EIA notification 2006…
Jamgaon, Raigarh, Chhattisgarh
Buildings & townships242.4 acresInitial checks17 Sept 2026
Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA to…
Jamgaon, Raigarh, Chhattisgarh
Industry242.4 acresUnder environmental review13 Sept 2026
Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA to…
Manuapali, Raigarh, Chhattisgarh
Industry242.4 acresWithdrawn24 Oct 2025
For Proposed Change in Configuration of Induction Furnace in SMS -1 (from 1X18 T IF +…
Jamgaon, Raigarh, Chhattisgarh
Power242.4 acresInitial checks7 Jun 2025
For Proposed "Change in the (SMS#2 plant) configuration of Induction Furnaces from 4 x…
Jamgaon, Raigarh, Chhattisgarh
Industry242.4 acresInitial checks5 Apr 2025
Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa, Without…
Manuapali, Raigarh, Chhattisgarh
Industry242.4 acresInitial checks1 Jun 2024
Industrial project by Msp Steel & Power Limited
Jamgaon, Raigarh, Chhattisgarh
Industry484.3 acresEnvironmental approval granted1 Jul 2023

Where Msp Steel and Power is building

Questions people ask

How many projects has Msp Steel and Power filed?

7 since January 2022, of which 1 are approved and 5 are awaiting a decision.

Where are Msp Steel and Power's projects?

Mostly in Raigarh, Chhattisgarh (7).

What did Msp Steel and Power file most recently?

No Increase in Pollution Load (NIPL) para 7(ii)c provisions under EIA notification 2006 for Technical Reconfiguration of Integrated Steel Plant Project (EC Identification No. EC23A008CG130672) by dropping Blast Furnace (450,000 TPA), Sinter Plant (720,000 TPA) & Oxygen Plant (220 TPD) and replacing with 3 x 20 T Induction Furnace (SMS -2) without increasing production capacity (5,94,000 TPA) & 40 MW- CFBC Captive Power Plant (CPP) at Villages Jamgaon, Tehsil & District Raigarh-496001 CG in Jamgaon, Raigarh, filed on 17 Sept 2026. Status: Initial checks.

About this information

Compiled from publicly available approval records, grouped by the applicant's registered name. What is Developing? is not affiliated with Msp Steel and Power; the badge is generated from its name. Group companies that file under different names may appear on separate pages. Statuses can change between our updates; check with the authority before making decisions. Spotted a mistake? Tell us.