Quick answers
What is this project?
Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA to 17,50,000 TPA @ 20% in 2 Phases under Para 7 (ii) of EIA Notification, 2006 as per OM F. No. IA3-22/10/2022-IA.III [E 177258] dtd. 11th April, 2022 is a proposed industrial project in Jamgaon, Raigarh, Chhattisgarh. The site covers 242.4 acres.
Who is building it?
The applicant is Msp Steel and Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Jamgaon, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹2,080 crore and a site of 242.4 acres.
When was it filed?
The application was filed on 13 Sept 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 20 Nov 2026 |
| Application filed | 13 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Industry |
| Applicant | Msp Steel and Power Limited |
| Land area | 242.4 acres (98.1 ha) |
| Project cost | ₹2,080 crore |
| Village / locality | Jamgaon |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03154 |
In context
113 applications in Raigarh since January 2022 are in the same category (Industry): 64 approved, 28 filed or under review, and 21 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 242.4 acres, this one is larger than 77% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamgaon, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- For Proposed Change in Configuration of Induction Furnace in SMS -1 (from 1X18… — initial checks, 0 m away
- For Proposed "Change in the (SMS#2 plant) configuration of Induction Furnaces… — initial checks, 0 m away
- Industrial project by Msp Steel & Power Limited — environmental approval granted, 0 m away
- Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa,… — initial checks, 0 m away
- No Increase in Pollution Load (NIPL) para 7(ii)c provisions under EIA… — initial checks, 0 m away
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — withdrawn, 0 m away
- Industrial project by Indoves Industrial Private Limited — lapsed, 1.2 km away
- Diversion of Revenue forest land Proposed for 2x800 MW Ultra Super Critical… — forest land use approved, 3.2 km away
More from Msp Steel and Power Limited in Raigarh
- No Increase in Pollution Load (NIPL) para 7(ii)c provisions under EIA… — initial checks
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — withdrawn
- For Proposed Change in Configuration of Induction Furnace in SMS -1 (from 1X18… — initial checks
- For Proposed "Change in the (SMS#2 plant) configuration of Induction Furnaces… — initial checks
- Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa,… — initial checks
- Industrial project by Msp Steel & Power Limited — environmental approval granted
All 7 Msp Steel and Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.