Quick answers
What is this project?
No Increase in Pollution Load (NIPL) para 7(ii)c provisions under EIA notification 2006 for Technical Reconfiguration of Integrated Steel Plant Project (EC Identification No. EC23A008CG130672) by dropping Blast Furnace (450,000 TPA), Sinter Plant (720,000 TPA) & Oxygen Plant (220 TPD) and replacing with 3 x 20 T Induction Furnace (SMS -2) without increasing production capacity (5,94,000 TPA) & 40 MW- CFBC Captive Power Plant (CPP) at Villages Jamgaon, Tehsil & District Raigarh-496001 CG is a proposed industrial building project in Jamgaon, Raigarh, Chhattisgarh. The site covers 242.4 acres.
Who is building it?
The applicant is Msp Steel and Power Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Initial checks”, as of 27 Nov 2026.
Where is it?
In Jamgaon, Raigarh, Chhattisgarh.
How big is it?
It has a stated cost of ₹2,221.3 crore and a site of 242.4 acres.
When was it filed?
The application was filed on 17 Sept 2026.
Project details
| Status | Initial checks |
|---|---|
| Status since | 17 Sept 2026 |
| Application filed | 17 Sept 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Msp Steel and Power Limited |
| Use | Industrial |
| Land area | 242.4 acres (98.1 ha) |
| Project cost | ₹2,221.3 crore |
| Village / locality | Jamgaon |
| Taluk / tehsil | Raigarh |
| District | Raigarh |
| State | Chhattisgarh |
| Location from | Site boundary on record |
| Our reference | WID-CG-03513 |
In context
13 applications in Raigarh since January 2022 are in the same category (Buildings & townships): 3 approved, 8 filed or under review, and 2 withdrawn, lapsed or rejected. At 242.4 acres, this one is larger than 69% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Jamgaon, Raigarh, Chhattisgarh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — withdrawn, 0 m away
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — under environmental review, 0 m away
- For Proposed Change in Configuration of Induction Furnace in SMS -1 (from 1X18… — initial checks, 0 m away
- For Proposed "Change in the (SMS#2 plant) configuration of Induction Furnaces… — initial checks, 0 m away
- Industrial project by Msp Steel & Power Limited — environmental approval granted, 0 m away
- Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa,… — initial checks, 0 m away
- Industrial project by Indoves Industrial Private Limited — lapsed, 1.2 km away
- Diversion of Revenue forest land Proposed for 2x800 MW Ultra Super Critical… — forest land use approved, 3.2 km away
More from Msp Steel and Power Limited in Raigarh
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — under environmental review
- Expansion of pellet plant capacity from EC approved Capacity of 12,50,000 TPA… — withdrawn
- For Proposed Change in Configuration of Induction Furnace in SMS -1 (from 1X18… — initial checks
- For Proposed "Change in the (SMS#2 plant) configuration of Induction Furnaces… — initial checks
- Enhancement of Production of Iron Ore Pellets From 1250000 Tpa to 1350000 Tpa,… — initial checks
- Industrial project by Msp Steel & Power Limited — environmental approval granted
All 7 Msp Steel and Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.