Power projects in Morbi, Gujarat

23 power projects in Morbi district, Gujarat, have applied for environmental, forest, wildlife or coastal approval since January 2022. 4 are still filed or under review, and 0 were filed in the last 30 days. Updated 27 Nov 2026.

Explore Morbi on the live map

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

23power projects
4filed or under review
0filed in the last 30 days

Where they are in the approval process

StatusProjects
Filed or under review3
In-principle approval1
Approved15
Withdrawn or lapsed4

Recently approved

ProjectTypeSizeStatusFiled
66KV D/C Morbi -B to Ravapar Line and 01 Circuit LILO at Prop. 66KV Sakat Sanala S/S…
Madhapar, Morvi
Power0.9 acresForest land use approved4 Jun 2025
66KV D/C Motadahisara (132KV) - Varshamedi (Navlakhi) line with 66KV 1Cx630sq.mm UGC (6+1)
Bodki, Maliya
Power1.5 acresForest land use approved25 May 2026
66kV S/C Jetpar Khirai line partly with 1CX630 sq mm(3+1) Under Ground cable line
Jetpar, Morvi
Power0 acres forest landForest land use approved30 Mar 2026
Laying UG 11 KV Transmission line parallel to Morbi-Halvad Road
Andarna, Morvi
Power0.2 acresForest land use approved10 May 2026
66kV LILO to Rasangpar SS from proposed 66kV Jetpar Khirai Line with 1CX630 sq mm (6+1)…
Khirai, Maliya
Power0 acresForest land use approved20 Nov 2025
765 kV D/C Transmission Line from Khavda-II PS (GIS) to Halvad for "Evacuation of…
Bhalgamda, Halvad
Power659 acres forest landForest land use approved3 Dec 2023
220kV D/C Shapar- Ghiyavad OH Line With AL-59 Conductor
Garida, Wankaner
Power5.4 acres forest landForest land use approved29 Aug 2025
11 KV UG Cable line along/across Wankaner-Lajai PF Road
Kothariya, Wankaner
Power0.2 acresForest land use approved1 Jan 2026
66KV S/C Pavadiyari(GETCO) Substation to Proposed Switchyard of M/s Sperox Tiles LLP…
Sapar, Morvi
Power0 acresForest land use approved23 Apr 2025
Laying of 66 KV line LILO at 66KV Rajavadla SS from Exist. 66KV Wankaner - Limbada line…
Lalpar, Wankaner
Power0.3 acresForest land use approved18 Sept 2024

Recently filed

ProjectTypeSizeStatusFiled
66KV Dc Jetpar-Shapar(Industrial) Line on Mc Tower With Acsr Panther Conductor and…
Jetpar, Morvi
Power0.6 acresMore information requested23 Oct 2026
66KV D/C Motadahisara (132KV) - Varshamedi (Navlakhi) line with 66KV 1Cx630sq.mm UGC (6+1)
Bodki, Maliya
Power1.5 acresForest land use approved25 May 2026
Laying UG 11 KV Transmission line parallel to Morbi-Halvad Road
Andarna, Morvi
Power0.2 acresForest land use approved10 May 2026
66KV S/C Bagathala Chachapar Line Partly on Dc Tower With Acsr Panther Conductor and…
Chanchapar, Morvi
Power0.1 acresIn-principle approval, conditions pending7 May 2026
66kV S/C Jetpar Khirai line partly with 1CX630 sq mm(3+1) Under Ground cable line
Jetpar, Morvi
Power0 acres forest landForest land use approved30 Mar 2026
11 KV UG Cable Line Across/Parallel Mitana-Paddhari Road in Morbi Dist.
Mitana, Tankara
Power0 acresLapsed23 Jan 2026
11 KV UG Cable line along/across Wankaner-Lajai PF Road
Kothariya, Wankaner
Power0.2 acresForest land use approved1 Jan 2026
66kV LILO to Rasangpar SS from proposed 66kV Jetpar Khirai Line with 1CX630 sq mm (6+1)…
Khirai, Maliya
Power0 acresForest land use approved20 Nov 2025
220kV D/C Shapar- Ghiyavad OH Line With AL-59 Conductor
Garida, Wankaner
Power5.4 acres forest landForest land use approved29 Aug 2025
66KV D/C Morbi -B to Ravapar Line and 01 Circuit LILO at Prop. 66KV Sakat Sanala S/S…
Madhapar, Morvi
Power0.9 acresForest land use approved4 Jun 2025
66KV S/C Pavadiyari(GETCO) Substation to Proposed Switchyard of M/s Sperox Tiles LLP…
Sapar, Morvi
Power0 acresForest land use approved23 Apr 2025
Laying of 66KV S/C line from existing Pavadiyari(Shapar) SS to Proposed M/s Skype Tile…
Sapar, Morvi
Power0.1 acresForest land use approved9 Dec 2024
66 KV S/C line from Exist. Nichi Mandal SS to Prop. M/s. Luxgres Ceramica LLP SS with UG…
Unchi Manda, Morvi
Power0 acresLapsed1 Dec 2024
765 kV D/C Transmission Line from Khavda-II PS (GIS) to Halvad for "Evacuation of…
Mansar, Halvad
Power₹861.9 croreCoastal clearance granted24 Sept 2024
Laying of 66 KV line LILO at 66KV Rajavadla SS from Exist. 66KV Wankaner - Limbada line…
Lalpar, Wankaner
Power0.3 acresForest land use approved18 Sept 2024
LILO-1 & LILO-2 of Lakadia – Ahmedabad 765kV D/C Transmission Line at Halvad for…
Ghanshyampur, Halvad
Power561 acresForest land use approved16 Aug 2024
66KV S/C Saraya Substation to M/s Slogan Polyfilms Pvt Ltd line with underground cable
Saraya, Tankara
Power0.1 acresForest land use approved15 Jul 2024
66 KV S/C line from Exist. Pavadiyari (Shapar) SS to Prop. M/s. Skype Tile LLP
Sapar, Morvi
Power0.1 acresLapsed18 Apr 2024
Laying of 66 KV S/C line from Exist. Pavadiyari (Shapar) SS to Prop. M/s. V-Tile…
Sapar, Morvi
Power0 acres forest landForest land use approved21 Feb 2024
Chitrapatang- 11KV Underground Cable HT Power Distribution Line
Ishanpur, Halvad
Power1.3 acresMore information requested17 Dec 2023
Chitrapatang Solar Park
Ishanpur, Halvad
Power1.3 acresMore information requested5 Dec 2023
765 kV D/C Transmission Line from Khavda-II PS (GIS) to Halvad for "Evacuation of…
Bhalgamda, Halvad
Power659 acres forest landForest land use approved3 Dec 2023
33 KV Overhead Transmission Line By Azalea Enterprises Pvt. Ltd
Panch Dwarka, Wankaner
Power8.4 acresLapsed16 Oct 2022

Questions people ask

How many power projects are planned in Morbi?

23 power projects in Morbi have applied for approval since January 2022. 19 of them are active (not withdrawn, lapsed or rejected) and 4 are still awaiting a decision.

What was approved most recently in Morbi?

66KV D/C Morbi -B to Ravapar Line and 01 Circuit LILO at Prop. 66KV Sakat Sanala S/S with 1Cx630 Sq.mm [2x(3+1)] UGC in Madhapar — “Forest land use approved” on 27 Aug 2026.

How often is this list updated?

Twice a day. The data on this page was last refreshed on 27 Nov 2026, 6:36 am IST.