Project details
| Status | In-principle approval, conditions pending |
|---|---|
| Status since | 4 Nov 2026 |
| Application filed | 7 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Gujarat Energy Transmission Corp LTD |
| Land area | 400 m² |
| Forest land | 390 m² |
| Project cost | ₹11.9 crore |
| Village / locality | Chanchapar |
| Taluk / tehsil | Morvi |
| District | Morbi |
| State | Gujarat |
| Location from | Site boundary on record |
| Our reference | WID-GJ-14070 |
In context
23 applications in Morbi since January 2022 are in the same category (Power): 15 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 5 months from filing to approval. At 0.1 acres, this one is smaller than 67% of them.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chanchapar, Morvi, Morbi, Gujarat. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Tirthak Industries — lapsed, 600 m away
- TRANSFER OF EC OBTAIBED VIDE LETTER NO. SEIAA/GUJ/EC/5(F)/2020/2021, DATED:… — environmental approval granted, 4.2 km away
- Public facility by M/s Healthgenic Chemicals Pvt Ltd — initial checks, 4.2 km away
- 125 Mm Dia PE Pipeline for Extenson Of PE Pipeline For New Industrial… — forest land use approved, 7.1 km away
- Jio Digital Fibre Pvt. Ltd. Laying of OFC Line Route : Amran-Chachavadar… — lapsed, 7.8 km away
- Gas Distribution Network in Tankara & Morbi Taluka & Surrounding Area — forest land use approved, 11.4 km away
- 66KV D/C Morbi -B to Ravapar Line and 01 Circuit LILO at Prop. 66KV Sakat… — forest land use approved, 12.2 km away
- Expansion for Proposed Project Synthetic Organic Chemicals (Resin-1000… — environmental approval granted, 12.2 km away
More from Gujarat Energy Transmission Corp LTD in Morbi
- 66KV Dc Jetpar-Shapar(Industrial) Line on Mc Tower With Acsr Panther Conductor… — more information requested
- 66KV D/C Motadahisara (132KV) - Varshamedi (Navlakhi) line with 66KV… — forest land use approved
- 66kV S/C Jetpar Khirai line partly with 1CX630 sq mm(3+1) Under Ground cable… — forest land use approved
- 66kV LILO to Rasangpar SS from proposed 66kV Jetpar Khirai Line with 1CX630 sq… — forest land use approved
- 220kV D/C Shapar- Ghiyavad OH Line With AL-59 Conductor — forest land use approved
- 66KV D/C Morbi -B to Ravapar Line and 01 Circuit LILO at Prop. 66KV Sakat… — forest land use approved
15 Gujarat Energy Transmission Corp projects in Morbi