Project details
| Status | Forest land use approved |
|---|---|
| Status since | 22 Apr 2026 |
| Application filed | 3 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 1,500 m² |
| Forest land | 670 m² |
| Project cost | ₹256 crore |
| Village / locality | Chidiyatapu |
| Taluk / tehsil | Port Blair |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site area on record |
| Our reference | WID-AN-00045 |
In context
8 applications in South Andaman since January 2022 are in the same category (Other): 5 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chidiyatapu, Port Blair, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Road Connecting Proposed Jetty to Radar Facility in Rutland — lapsed, 2.8 km away
- 4g Saturation Project in Andaman and Nicobar — forest land use approved, 2.9 km away
- Rutland Water Supply Project Stage II Sw: Augmentation of Water Supply on… — forest land use approved, 3.4 km away
- Conduct of Topographical Survey and Gis Mapping at Rutland Island for… — forest land use approved, 4.8 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — under wildlife review, 5.4 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — lapsed, 5.4 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — lapsed, 5.4 km away
- Laying of Underground 33 KV HT UG cable from Manjery 2-Pole structure to APWD… — lapsed, 5.4 km away
More from Mahesh Nair in South Andaman
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — coastal clearance granted
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — in-principle approval, conditions pending
- Erection of 40 M Tower Under 4g Saturation Project by Goi at Elephanata Beach,… — lapsed
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — forest land use approved
- 4g SATURATION PROJECT IN ANDAMAN AND NICOBAR- OFC LAYING — lapsed
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — lapsed