Project details
| Status | Forest land use approved |
|---|---|
| Status since | 4 Jan 2024 |
| Application filed | 1 Sept 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 400 m² |
| Forest land | 400 m² |
| Village / locality | Little Andaman |
| Taluk / tehsil | Little Andaman |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00088 |
In context
8 applications in South Andaman since January 2022 are in the same category (Other): 5 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 18 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Little Andaman, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Hut Bay Stone Quarry (Non-Explosive Block) — environmental approval granted, 4.6 km away
- HutBay Stone Quarry for Non-Explosive Blocks — environmental approval granted, 4.7 km away
- Proposal for laying OFC Cable in Little Andaman — lapsed, 15.8 km away
- Construction of Approach Road to Krishna Nallah Water Fall — lapsed, 17.4 km away
- White Moorum Quarry - 2024 — environmental approval granted, 20.4 km away
- 4G Mobile Tower Installation for Uncovered Villages in Little Andaman Division — initial checks, 30.6 km away
- Re-Construction of 15 Meter High Rcc Lighthouse Tower With Allied Facilities… — coastal clearance granted, 90.4 km away
- Re-Construction Of 15-Meter-High RCC Lighthouse Tower With Allied Facilities… — more information requested, 90.4 km away
More from Mahesh Nair in South Andaman
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — coastal clearance granted
- Diversion of 0.02 Ha of Forest Land for Construction of Mobile Tower at… — in-principle approval, conditions pending
- Erection of 40 M Tower Under 4g Saturation Project by Goi at Elephanata Beach,… — lapsed
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — forest land use approved
- 4g SATURATION PROJECT IN ANDAMAN AND NICOBAR- OFC LAYING — lapsed
- 4g Saturation Project in Andaman and Nicobar Islands- Ofc Laying — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.