Project details
| Status | Forest land use approved |
|---|---|
| Status since | 18 Apr 2026 |
| Application filed | 30 May 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle |
| Land area | 400 m² |
| Forest land | 440 m² |
| Project cost | ₹1.1 crore |
| Village / locality | Chidiyatapu |
| Taluk / tehsil | Port Blair |
| District | South Andaman |
| State | Andaman and Nicobar Islands |
| Location from | Site boundary on record |
| Our reference | WID-AN-00063 |
In context
11 applications in South Andaman since January 2022 are in the same category (Telecom): 5 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 0.1 acres, this one is smaller than 73% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chidiyatapu, Port Blair, South Andaman, Andaman and Nicobar Islands. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Supreme Hotel at Survey no. 295, Chidiyatapu, Village-Bimbliton,… — coastal clearance granted, 3.2 km away
- Temporary Tourism Facilities Shacks, Toilets, Change Rooms, Walk Ways… — lapsed, 5 km away
- Conduct of Topographical Survey and Gis Mapping at Rutland Island for… — forest land use approved, 6.4 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — lapsed, 6.9 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — lapsed, 6.9 km away
- Laying of Underground 33 KV HT UG cable from Manjery 2-Pole structure to APWD… — lapsed, 6.9 km away
- (Rutland Water Supply Project Stage-II) SW- Laying of Underground 33 KV HT UG… — under wildlife review, 6.9 km away
- 4g Saturation Project in Andaman and Nicobar — forest land use approved, 7.9 km away
More from Office of the Joint Controller of Communication Accounts Dot Andaman and Nicobar Circle in South Andaman
- Installation of One 4G Tower in South Andaman under USOF Project — forest land use approved
- Diversion of forest land for laying of Optical Fibre Cable from Ferrargunj… — forest land use approved
- Diversion of Forest Land for Laying of Ofc Cable Jirkatang Check Post to… — forest land use approved
- 4G Mobile Tower Installation for Uncovered Villages in Little Andaman Division — initial checks
- Installation of 4G Tower in South Andaman under USOF Project — lapsed