0.60 MILLION TONNES PER ANNUM OF LIMESTONE PRODUCTION [Total Excavation: 0.60 MTPA (Limestone: 0.60 MTPA & Top Soil/OB: Nil)] from Erragudi-Hussainapuram-Yanakandla Limestone Block (LEASE AREA: 131.568 Ha) by M/s Jayajothi cement Private Limited is an approved mining project in Erragudi, Banaganapalle, Nandyal, Andhra Pradesh. The site covers 325.1 acres.
Who is building it?
The applicant is Sree Jayajothi Cements Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Dec 2022), as of 27 Nov 2026.
Where is it?
In Erragudi, Banaganapalle, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹10 crore and a site of 325.1 acres.
When was it filed?
The application was filed on 1 Dec 2022.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 1 Dec 2022 |
| Application filed | 1 Dec 2022 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Sree Jayajothi Cements Private Limited |
| Land area | 325.1 acres (131.6 ha) |
| Project cost | ₹10 crore |
| Village / locality | Erragudi |
| Taluk / tehsil | Banaganapalle |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Village |
| Our reference | WID-AP-00085 |
In context
135 applications in Nandyal since January 2022 are in the same category (Mining): 80 approved, 16 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 325.1 acres, this one is larger than 90% of them.
Where it is
Erragudi, Banaganapalle, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kotapadu Limestone Mine — environmental approval granted, 9.5 km away
- Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco… — under environmental review, 9.5 km away
- Expansion of Kotapadu Limestone Mine (Ml Area: 663.46 Ha.) of M/S.The Ramco… — environmental approval granted, 9.5 km away
- Amalgamated Korumanipalli Limestone Mine (ML Area: 254.856 Ha.) with Limestone… — lapsed, 11.3 km away
- Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0… — environmental approval granted, 12.9 km away
- Enhancement in Cement production (Line-I) from 2.0 MTPA to 2.4 MTPA, with no… — initial checks, 12.9 km away
- Amendment to the Environmental Clearance (Ec) for Specific Condition No III of… — environmental approval granted, 12.9 km away
- Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0… — cleared for impact study, 12.9 km away
More from Sree Jayajothi Cements Private Limited in Nandyal
- Extension of Validity of Environmental Clearance for Lime kankar Mine with a… — initial checks
- Extension of Validity of Environmental Clearance for Lime kankar Mine with a… — environmental approval granted
- Gorlagutta Limestone Block-1.2 MILLION TONNES PER ANNUM OF LIMESTONE… — environmental approval granted
- Approach access for Limestone Mine of Sree Jayajothi Cements Pvt Ltd — forest land use approved
All 5 Sree Jayajothi Cements projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.