Quick answers
What is this project?
Proposed Production of Low Carbon Ferro Manganese(100 TPM) or Low Carbon Silico Manganese (100 TPM) or Low Carbon Ferro Chrome (100 TPM) at Plot No - 16, APIIC Growth Center, Phase - 1, Bobbili Mandalam, Vizianagaram District, Andhra Pradesh by M/s Sri Santhi Industries is a proposed industrial project in Bobbili, Vizianagaram, Andhra Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Sri Santhi Industries.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Bobbili, Vizianagaram, Andhra Pradesh.
How big is it?
It has a stated cost of ₹2 crore and a site of 0.6 acres.
When was it filed?
The application was filed on 10 Jan 2023.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 10 Jan 2023 |
| Application filed | 10 Jan 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Sri Santhi Industries |
| Land area | 2,400 m² |
| Project cost | ₹2 crore |
| Village / locality | Bobbili |
| Taluk / tehsil | Bobbili |
| District | Vizianagaram |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00450 |
In context
40 applications in Vizianagaram since January 2022 are in the same category (Industry): 25 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 0.6 acres, this one is smaller than 100% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bobbili, Vizianagaram, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Production of Low Carbon Ferro Manganese(100 TPM) or Low Carbon… — environmental approval granted, 0 m away
- Greenfield Manganese Sinter Plant of Capacity 7,12,800 TPA or Iron Sinter… — cleared for impact study, 1.5 km away
- Transfer of Environment clearance of M/s Hira Electro Smelters Private Limited… — environmental approval granted, 1.9 km away
- Expansion of Ferro Alloys Manufacturing Unit from 83,682 TPA (Fe-Mn/ Si-Mn or… — under environmental review, 1.9 km away
- Expansion of Ferro Alloys Manufacturing Unit from 83,682 TPA (Fe-Mn/ Si-Mn or… — cleared for impact study, 1.9 km away
- Environmental Clearance for Expansion of Ferro Alloys Manufacturing Unit from… — returned to applicant, 1.9 km away
- Proposed Change in Configuration of Ferro Alloys Production Unit by M/s Hira… — environmental approval granted, 1.9 km away
- Industrial project by M/s. Evershine Ply and Boards — environmental approval granted, 2 km away
More from Sri Santhi Industries in Vizianagaram
- Proposed Production of Low Carbon Ferro Manganese(100 TPM) or Low Carbon… — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.