What is Developing? Open the mapMap

Cleared for impact studyIndustry · Vizianagaram, Andhra Pradesh

Expansion of Ferro Alloys Manufacturing Unit from 83,682 TPA (Fe-Mn/ Si-Mn or CLU/CCS {Low/medium carbon Fe-Mn- 60,000 TPA included within production of 83,682 TPA)} to 1,00,000 TPA (Fe-Mn/ Si-Mn or CLU/CCS (Low/medium carbon Fe-Mn - 60,000 TPA (included within production of 1,00,000 TPA)} at Plot No. 364-367, APIIC Growth Centre, Bobbili, District-Vizianagaram, Andhra Pradesh by Hira Electro Smelters Limited

Expansion of Ferro Alloys Manufacturing Unit from 83,682 TPA (Fe-Mn/ Si-Mn or CLU/CCS {Low/medium carbon Fe-Mn- 60,000 TPA included within production of 83,682 TPA)} to 1,00,000 TPA (Fe-Mn/ Si-Mn or CLU/CCS (Low/medium carbon Fe-Mn - 60,000 TPA (included within production of 1,00,000 TPA)} at Plot No. 364-367, APIIC Growth Centre, Bobbili, District-Vizianagaram, Andhra Pradesh by Hira Electro Smelters Limited is a proposed industrial project in Mettavalasa, Bobbili, Vizianagaram, Andhra Pradesh. The site covers 23.7 acres. Its stated project cost is ₹209.2 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 22 Jun 2026).

See it on the live map All projects in Vizianagaram

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Expansion of Ferro Alloys Manufacturing Unit from 83,682 TPA (Fe-Mn/ Si-Mn or CLU/CCS {Low/medium carbon Fe-Mn- 60,000 TPA included within production of 83,682 TPA)} to 1,00,000 TPA (Fe-Mn/ Si-Mn or CLU/CCS (Low/medium carbon Fe-Mn - 60,000 TPA (included within production of 1,00,000 TPA)} at Plot No. 364-367, APIIC Growth Centre, Bobbili, District-Vizianagaram, Andhra Pradesh by Hira Electro Smelters Limited is a proposed industrial project in Mettavalasa, Bobbili, Vizianagaram, Andhra Pradesh. The site covers 23.7 acres.

Who is building it?

The applicant is Hira Electro Smelters Limited.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 22 Jun 2026), as of 27 Nov 2026.

Where is it?

In Mettavalasa, Bobbili, Vizianagaram, Andhra Pradesh.

How big is it?

It has a stated cost of ₹209.2 crore and a site of 23.7 acres.

When was it filed?

The application was filed on 13 Jun 2026.

Project details

StatusCleared for impact study
Status since22 Jun 2026
Application filed13 Jun 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantHira Electro Smelters Limited
Land area23.7 acres (9.6 ha)
Project cost₹209.2 crore
Village / localityMettavalasa
Taluk / tehsilBobbili
DistrictVizianagaram
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-03472

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Expansion filed 29 Oct 2026Under environmental review23.7 acres₹209.2 crore
Early planning filed 13 Jun 2026 (this page)Cleared for impact study23.7 acres₹209.2 crore

In context

40 applications in Vizianagaram since January 2022 are in the same category (Industry): 25 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 23.7 acres, this one is smaller than 55% of them.

11 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Mettavalasa, Bobbili, Vizianagaram, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hira Electro Smelters Limited in Vizianagaram

All 6 Hira Electro Smelters projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.