Quick answers
What is Mining project by M/s. Samrudhi Minerals and Processors?
This proposed mining project by M/s. Samrudhi Minerals and Processors is in Yellapuram, Gangavaram, Alluri Sitharama Raju, Andhra Pradesh. The site covers 62.3 acres.
Who is building it?
The applicant is Samrudhi Minerals & Processors.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 22 May 2023), as of 27 Nov 2026.
Where is it?
In Yellapuram, Gangavaram, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹92 lakh and a site of 62.3 acres.
When was it filed?
The application was filed on 22 May 2023.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 22 May 2023 |
| Application filed | 22 May 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Samrudhi Minerals & Processors |
| Land area | 62.3 acres (25.2 ha) |
| Project cost | ₹92 lakh |
| Village / locality | Yellapuram |
| Taluk / tehsil | Gangavaram |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00489 |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 62.3 acres, this one is larger than 91% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Yellapuram, Gangavaram, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Preliminary exploration for Graphite and associated mineralization in… — forest land use approved, 5.7 km away
- Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided… — cleared for impact study, 12.7 km away
- Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided… — cleared for impact study, 13.5 km away
- Proposed Road Metal & Ballast, Rough Stone, Boulders & Ordinary Earth Mining… — environmental approval granted, 14.5 km away
- Sri Peeta Rajasekhar — under environmental review, 14.6 km away
- Sri Peeta Rajasekhar — lapsed, 14.6 km away
- Proposed Road Metal & Ballast, Rough Stone, Boulders & Ordinary Earth Mining… — environmental approval granted, 14.6 km away
- Widening to Two Lane With Paved Shoulder of Rampachodavaram - Koyyuru Section… — forest land use approved, 15 km away