Quick answers
What is this project?
Widening to Two Lane With Paved Shoulder of Rampachodavaram - Koyyuru Section of Nh-516e From Km.43+700 to Km.113+820 in the State of Andhra Pradesh is an approved road project in Sarabbavaram, Rajavommangi, Alluri Sitharama Raju, Andhra Pradesh. The site covers 539.9 acres.
Who is building it?
The applicant is Ministry of Road Transport & Highways.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 12 Jun 2025), as of 27 Nov 2026.
Where is it?
In Sarabbavaram, Rajavommangi, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹506.8 crore; a site of 539.9 acres and 45 acres (18.2 ha) of forest land.
When was it filed?
The application was filed on 21 Jan 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 12 Jun 2025 |
| Application filed | 21 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Ministry of Road Transport & Highways |
| Land area | 539.9 acres (218.5 ha) |
| Forest land | 45 acres (18.2 ha) |
| Project cost | ₹506.8 crore |
| Village / locality | Sarabbavaram |
| Taluk / tehsil | Rajavommangi |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04772 |
In context
23 applications in Alluri Sitharama Raju since January 2022 are in the same category (Roads & highways): 2 approved, 10 filed or under review, and 11 withdrawn, lapsed or rejected. At 539.9 acres, this one is larger than 95% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sarabbavaram, Rajavommangi, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Reconnaissance survey for Iron ore, Graphite and associated in mineralization… — initial checks, 2.6 km away
- Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided… — cleared for impact study, 4.5 km away
- Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided… — cleared for impact study, 7.4 km away
- Preliminary exploration for Graphite and associated mineralization in… — forest land use approved, 9.3 km away
- Sri Ramavath Krishna Naik — environmental approval granted, 11.6 km away
- Mining project by M/s. Samrudhi Minerals and Processors — cleared for impact study, 15 km away
- Sri S.B.V Reddy — environmental approval granted, 19 km away
- Proposed Road Metal & Ballast, Rough Stone, Boulders & Ordinary Earth Mining… — environmental approval granted, 24.4 km away
More from Ministry of Road Transport & Highways in Alluri Sitharama Raju
- Rehabilitation and Upgradation to 2-Lane With Paved Shoulder Configuration of… — under forest review
- Widening to two-lane with paved shoulder of Chintoor to Motu Section of NH-326… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.