What is Developing? Open the mapMap

Cleared for impact studyMining · Alluri Sitharama Raju, Andhra Pradesh

Mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided Co-operative Society Limited

This proposed mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided Co-operative Society Limited is in Bhimavaram, Addateegala, Alluri Sitharama Raju, Andhra Pradesh. The site covers 32.5 acres. Its stated project cost is ₹85 lakh. As of 27 Nov 2026, its status is “Cleared for impact study” (since 8 Jun 2023).

See it on the live map All projects in Alluri Sitharama Raju

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

This proposed mining project by M/s. The Aishwarya Tribal Labour Contract Mutually Aided Co-operative Society Limited is in Bhimavaram, Addateegala, Alluri Sitharama Raju, Andhra Pradesh. The site covers 32.5 acres.

Who is building it?

The applicant is Aishwarya Tribal Labour Contract Mutually Aided Coop Society LTD.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 8 Jun 2023), as of 27 Nov 2026.

Where is it?

In Bhimavaram, Addateegala, Alluri Sitharama Raju, Andhra Pradesh.

How big is it?

It has a stated cost of ₹85 lakh and a site of 32.5 acres.

When was it filed?

The application was filed on 8 Jun 2023.

Project details

StatusCleared for impact study
Status since8 Jun 2023
Application filed8 Jun 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAishwarya Tribal Labour Contract Mutually Aided Coop Society LTD
Land area32.5 acres (13.1 ha)
Project cost₹85 lakh
Village / localityBhimavaram
Taluk / tehsilAddateegala
DistrictAlluri Sitharama Raju
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-00823

In context

44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 32.5 acres, this one is larger than 75% of them.

No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.

Where it is

Bhimavaram, Addateegala, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Aishwarya Tribal Labour Contract Mutually Aided Coop Society LTD in Alluri Sitharama Raju

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.