Quick answers
What is this project?
Environmental Clearance under "B2" Category for Establishment of Grain Based Ethanol Distillery capacity 200 KLPD with 6.0 MW co-generation power plant at APIIC Growth Centre, Industrial Estate, Bobbili, District - Vizianagaram, Andhra Pradesh, India by M/s Satya Biofuels Private Limited is an approved industrial project in Mettavalasa, Bobbili, Vizianagaram, Andhra Pradesh. The site covers 30 acres.
Who is building it?
The applicant is Satya Biofuels Private Limited.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 15 Nov 2023), as of 27 Nov 2026.
Where is it?
In Mettavalasa, Bobbili, Vizianagaram, Andhra Pradesh.
How big is it?
It has a stated cost of ₹235.3 crore and a site of 30 acres.
When was it filed?
The application was filed on 27 Sept 2023.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 15 Nov 2023 |
| Application filed | 27 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Industry |
| Applicant | Satya Biofuels Private Limited |
| Land area | 30 acres (12.1 ha) |
| Project cost | ₹235.3 crore |
| Village / locality | Mettavalasa |
| Taluk / tehsil | Bobbili |
| District | Vizianagaram |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00511 |
In context
40 applications in Vizianagaram since January 2022 are in the same category (Industry): 25 approved, 10 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 30 acres, this one is larger than 57% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Mettavalasa, Bobbili, Vizianagaram, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Industrial project by M/s. Evershine Ply and Boards — environmental approval granted, 350 m away
- Transfer of Environment clearance of M/s Hira Electro Smelters Private Limited… — environmental approval granted, 550 m away
- Greenfield Manganese Sinter Plant of Capacity 7,12,800 TPA or Iron Sinter… — cleared for impact study, 550 m away
- Expansion of Ferro Alloys Manufacturing Unit from 83,682 TPA (Fe-Mn/ Si-Mn or… — under environmental review, 550 m away
- Expansion of Ferro Alloys Manufacturing Unit from 83,682 TPA (Fe-Mn/ Si-Mn or… — cleared for impact study, 550 m away
- Environmental Clearance for Expansion of Ferro Alloys Manufacturing Unit from… — returned to applicant, 550 m away
- Proposed Change in Configuration of Ferro Alloys Production Unit by M/s Hira… — environmental approval granted, 550 m away
- Transfer of Environment Clearance of M/s Yona Smelters Private Limited to M/s… — environmental approval granted, 750 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.