One of 2 filings for this project. The project's main page, with every filing and where each stands: Gadikota Pumped Storage Project (1200 MW)
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 30 Jan 2024 |
| Application filed | 22 Nov 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | New and Renewable Energy Development Corporation of Andhra Pradesh LTD (Nredcap) |
| Land area | 1,995 acres (807.4 ha) |
| Project cost | ₹7,291.2 crore |
| Village / locality | Edaballi |
| Taluk / tehsil | Veeraballe |
| District | Annamayya |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-00551 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Ownership transfer filed 5 Jun 2025 | Cleared for impact study | 1,995 acres | ₹7,291.2 crore |
| Early planning filed 22 Nov 2023 (this page) | Cleared for impact study | 1,995 acres | ₹7,291.2 crore |
In context
8 applications in Annamayya since January 2022 are in the same category (Water & irrigation): 3 approved, 1 filed or under review, and 4 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Edaballi, Veeraballe, Annamayya, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gadikota Pumped Storage Project (1200 MW) — cleared for impact study, 0 m away
- Gadikota Pumped Storage Project — more information requested, 750 m away
- Gadikota Pumped Storage Project — lapsed, 750 m away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — more information requested, 4.7 km away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 4.7 km away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 4.7 km away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 4.7 km away
- Permission for Drilling of 26 Nos. Boreholes over an Area of 0.63 Ha in… — forest land use approved, 4.9 km away
More from New and Renewable Energy Development Corporation of Andhra Pradesh LTD (Nredcap) in Annamayya
- Rayavaram Hydro-Electric Pumped Storage Project (1500 MW) — cleared for impact study
- Yadaballi Pumped Storage Project (1200 MW) — returned to applicant
4 New & Renewable Energy Development Corporation of Andhra Pradesh projects in Annamayya
All 32 New & Renewable Energy Development Corporation of Andhra Pradesh projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.