One of 2 filings for this project. The project's main page, with every filing and where each stands: Gadikota Pumped Storage Project
Project details
| Status | Lapsed |
|---|---|
| Status since | 5 May 2026 |
| Application filed | 25 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Apgenco Nhpc Green Energy Limited |
| Land area | 1,680.5 acres (680.1 ha) |
| Forest land | 179.6 acres (72.7 ha) |
| Project cost | ₹76.8 crore |
| Village / locality | Edaballi |
| Taluk / tehsil | Veeraballe |
| District | Annamayya |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04891 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Jul 2026 | More information requested | 1,680.5 acres | ₹76.8 crore |
| New project filed 25 Jun 2025 (this page) | Lapsed | 1,680.5 acres | ₹76.8 crore |
In context
9 applications in Annamayya since January 2022 are in the same category (Other): 1 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
11 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Edaballi, Veeraballe, Annamayya, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gadikota Pumped Storage Project — more information requested, 0 m away
- Gadikota Pumped Storage Project (1200 MW) — cleared for impact study, 750 m away
- Gadikota Pumped Storage Project (1200 MW) — cleared for impact study, 750 m away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — more information requested, 4 km away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 4 km away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 4 km away
- Borehole Drilling Permission for Veeraballi Off-Stream Closed Loop Pumped… — lapsed, 4 km away
- Permission for Drilling of 26 Nos. Boreholes over an Area of 0.63 Ha in… — forest land use approved, 4.2 km away
All 3 Apgenco Nhpc Green Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.