Quick answers
What is Mining project by M/s Muslim Minority Welfare Society?
This approved mining project by M/s Muslim Minority Welfare Society is in Cherlapalle, Owk, Nandyal, Andhra Pradesh. The site covers 19.3 acres.
Who is building it?
The applicant is Arif Sunni.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 26 Jun 2024), as of 27 Nov 2026.
Where is it?
In Cherlapalle, Owk, Nandyal, Andhra Pradesh.
How big is it?
It has a stated cost of ₹85 lakh and a site of 19.3 acres.
When was it filed?
The application was filed on 12 Feb 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 26 Jun 2024 |
| Application filed | 12 Feb 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Arif Sunni |
| Land area | 19.3 acres (7.8 ha) |
| Project cost | ₹85 lakh |
| Village / locality | Cherlapalle |
| Taluk / tehsil | Owk |
| District | Nandyal |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01155 |
In context
135 applications in Nandyal since January 2022 are in the same category (Mining): 80 approved, 16 filed or under review, and 39 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 19.3 acres, this one is larger than 70% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 25.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 1 mining lease has applied within 5 km.
Where it is
Cherlapalle, Owk, Nandyal, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- 2.595 Hectares of Lime Stone Slabs(Black) Quarry of Sri S. Rameswara… — lapsed, 200 m away
- AMENDMENT IN CONSENT TO ESTABLISHMENT CHANGE IN CONFIGURATION OF CEMENT PLANT… — initial checks, 7.9 km away
- Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0… — environmental approval granted, 7.9 km away
- Enhancement in Cement production (Line-I) from 2.0 MTPA to 2.4 MTPA, with no… — initial checks, 7.9 km away
- Amendment to the Environmental Clearance (Ec) for Specific Condition No III of… — environmental approval granted, 7.9 km away
- Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0… — cleared for impact study, 7.9 km away
- Expansion of Cement Plant (Clinker from 3.15 MTPA to 6.3 MTPA, Cement from 2.0… — withdrawn, 7.9 km away
- Validity Extension of Environment Clearance Letter no. J-11015/243/2008-IA.II… — environmental approval granted, 8.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.