One of 2 filings for this project. The project's main page, with every filing and where each stands: Gandikovvuru Sand Reach
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 5 Jul 2024 |
| Application filed | 23 Mar 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Royalty Inspector DMGO Kadapa |
| Land area | 18.7 acres (7.6 ha) |
| Project cost | ₹10 lakh |
| Village / locality | Gandikovvuru |
| Taluk / tehsil | Chakrayapet |
| District | Y.S.R. |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-01690 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 17 Oct 2024 | Environmental approval granted | 18.7 acres | ₹10 lakh |
| Early planning filed 23 Mar 2024 (this page) | Cleared for impact study | 18.7 acres | ₹10 lakh |
In context
139 applications in Y.S.R. since January 2022 are in the same category (Mining): 106 approved, 8 filed or under review, and 25 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 18.7 acres, this one is larger than 58% of them.
No other mining lease on record is within 500 m of this site; 4 have applied within 5 km.
Where it is
Gandikovvuru, Chakrayapet, Y.S.R., Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Gandikovvuru Sand Reach — environmental approval granted, 0 m away
- Marellamadaka River Sand Reach — environmental approval granted, 1.8 km away
- Marellamadaka-II Open Sand Reach — environmental approval granted, 2.6 km away
- Kondavandlapalli Open Sand Reach — cleared for impact study, 3.7 km away
- Quartz mine production @ 10,80,000 TPA by Dr. S. Ravindranath Reddy — environmental approval granted, 4.9 km away
- Tunnel between pump House PH-01 & Kaletivagu Reservoir for lifting water from… — more information requested, 5.8 km away
- Tunnel between pump House PH-01 & Kaletivagu Reservoir for lifting water from… — lapsed, 6.2 km away
- Vempalli PSP (1500 MW)-Request for Issue of Permission for Geo-Technical… — more information requested, 7.7 km away
More from Royalty Inspector DMGO Kadapa in Y.S.R.
- Venkayyakalva Sand Reach - 20 Ha — cleared for impact study
- Sambatur Open Sand Reach — environmental approval granted
- Marellamadaka-II Open Sand Reach — environmental approval granted
- Kondavandlapalli Open Sand Reach — cleared for impact study
- Goriganur Sand Reach — environmental approval granted
- Goriganur Sand Reach — environmental approval granted
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.