Quick answers
What is Smt. Pujari Parvathamma?
Smt. Pujari Parvathamma is an approved mining project in Chaparatipalem, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh. The site covers 7.6 acres.
Who is building it?
The applicant is Pujari Parvatamma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 5 Sept 2025), as of 27 Nov 2026.
Where is it?
In Chaparatipalem, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹84 lakh and a site of 7.6 acres.
When was it filed?
The application was filed on 22 Jul 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 5 Sept 2025 |
| Application filed | 22 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Pujari Parvatamma |
| Land area | 7.6 acres (3.1 ha) |
| Project cost | ₹84 lakh |
| Village / locality | Chaparatipalem |
| Taluk / tehsil | Gudem Kotha Veedhi |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02502 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 22 Jul 2025 (this page) | Environmental approval granted | 7.6 acres | ₹84 lakh |
| New project filed 19 Mar 2025 | Not approved | 7.6 acres | ₹84 lakh |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 7.6 acres, this one is smaller than 68% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Chaparatipalem, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Smt. Pujari Parvathamma — not approved, 0 m away
- Sri B. Rajendra Prasad — lapsed, 1.1 km away
- Sri B. Rajendra Prasad — cleared for impact study, 1.1 km away
- Sri N. Musili Babu — environmental approval granted, 10.4 km away
- Sri Ramavath Krishna Naik — environmental approval granted, 11.9 km away
- Formation & Construction of road from Kunukuru to Nallabilli village — lapsed, 13.9 km away
- Formation and Bt to the Road From P.Kothuru to Kothavedurupalem — more information requested, 17 km away
- Formation and Bt to the Road Including Construction of Culverts From P.Kothuru… — more information requested, 17.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.