Quick answers
What is Sri N. Musili Babu?
Sri N. Musili Babu is an approved mining project in Paradesipakalu, Koyyuru, Alluri Sitharama Raju, Andhra Pradesh. The site covers 11.4 acres.
Who is building it?
The applicant is Narse Musili Babu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 16 Jun 2026), as of 27 Nov 2026.
Where is it?
In Paradesipakalu, Koyyuru, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹60 lakh and a site of 11.4 acres.
When was it filed?
The application was filed on 24 Apr 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 16 Jun 2026 |
| Application filed | 24 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Narse Musili Babu |
| Land area | 11.4 acres (4.6 ha) |
| Project cost | ₹60 lakh |
| Village / locality | Paradesipakalu |
| Taluk / tehsil | Koyyuru |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03764 |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 11.4 acres, this one is larger than 57% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Paradesipakalu, Koyyuru, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri B. Rajendra Prasad — lapsed, 9.3 km away
- Sri B. Rajendra Prasad — cleared for impact study, 9.3 km away
- Smt. Pujari Parvathamma — environmental approval granted, 10.4 km away
- Smt. Pujari Parvathamma — not approved, 10.4 km away
- Proposed Enhancement of Quarrying Operations for Laterite Ore : Jartha… — under environmental review, 16.7 km away
- Proposed Enhancement of Quarrying Operations for Laterite Ore : Jartha… — cleared for impact study, 16.7 km away
- Sri Ramavath Krishna Naik — environmental approval granted, 20.5 km away
- Formation & Construction of road from Kunukuru to Nallabilli village — lapsed, 20.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.