Quick answers
What is Sri B. Rajendra Prasad?
Sri B. Rajendra Prasad is a lapsed mining project in Dokkuluru, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh. The site covers 28.1 acres.
Who is building it?
The applicant is Bukka Rajendraprasad.
Has it been approved?
No. The application was lapsed on 10 Sept 2026, so it is no longer under consideration.
Where is it?
In Dokkuluru, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 28.1 acres.
When was it filed?
The application was filed on 14 Apr 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sri B. Rajendra Prasad
Project details
| Status | Lapsed |
|---|---|
| Status since | 10 Sept 2026 |
| Application filed | 14 Apr 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Bukka Rajendraprasad |
| Land area | 28.1 acres (11.4 ha) |
| Project cost | ₹1 crore |
| Village / locality | Dokkuluru |
| Taluk / tehsil | Gudem Kotha Veedhi |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03708 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Apr 2026 (this page) | Lapsed | 28.1 acres | ₹1 crore |
| Early planning filed 4 Dec 2024 | Cleared for impact study | 28.1 acres | ₹1 crore |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 28.1 acres, this one is larger than 70% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Dokkuluru, Gudem Kotha Veedhi, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri B. Rajendra Prasad — cleared for impact study, 0 m away
- Smt. Pujari Parvathamma — environmental approval granted, 1.1 km away
- Smt. Pujari Parvathamma — not approved, 1.1 km away
- Sri N. Musili Babu — environmental approval granted, 9.3 km away
- Sri Ramavath Krishna Naik — environmental approval granted, 12.9 km away
- Formation & Construction of road from Kunukuru to Nallabilli village — lapsed, 14.2 km away
- Formation and Bt to the Road From P.Kothuru to Kothavedurupalem — more information requested, 18.1 km away
- Formation and Bt to the Road Including Construction of Culverts From P.Kothuru… — more information requested, 18.2 km away