What is Mining project by M/s. Sri Balaji Stone crusher?
This approved mining project by M/s. Sri Balaji Stone crusher is in Lachchannagudipudi, Tadikonda, Guntur, Andhra Pradesh. The site covers 9.3 acres.
Who is building it?
The applicant is Tummala lakshmamma.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 23 Apr 2025), as of 27 Nov 2026.
Where is it?
In Lachchannagudipudi, Tadikonda, Guntur, Andhra Pradesh.
How big is it?
It has a stated cost of ₹30 lakh and a site of 9.3 acres.
When was it filed?
The application was filed on 28 Feb 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 23 Apr 2025 |
| Application filed | 28 Feb 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Tummala lakshmamma |
| Land area | 9.3 acres (3.8 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Lachchannagudipudi |
| Taluk / tehsil | Tadikonda |
| District | Guntur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02648 |
In context
164 applications in Guntur since January 2022 are in the same category (Mining): 104 approved, 16 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9.3 acres, this one is larger than 79% of them.
No other mining lease on record is within 500 m of this site; 1 has applied within 5 km.
Where it is
Lachchannagudipudi, Tadikonda, Guntur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Vytla Srinivasu – 1.205 Ha — environmental approval granted, 1.3 km away
- Sri Vytla Srinivasu – 4.520 Ha — environmental approval granted, 8 km away
- M/s. Mohan Rao (MR) Constructions Private Limited Construction of Residential… — more information requested, 8.5 km away
- Sri Polu Narasaiah — under environmental review, 8.6 km away
- Sri Polu Narasaiah — more information requested, 8.6 km away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — environmental approval granted, 8.7 km away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — lapsed, 8.7 km away
- 6.00 Hect. of Road Metal & Gravel Quarry of Sri Kurra Jogeswara Rao, Sy. No.… — environmental approval granted, 8.8 km away