Quick answers
What is Sri Polu Narasaiah?
Sri Polu Narasaiah is a proposed mining project in Anantavaram, Thullur, Guntur, Andhra Pradesh. The site covers 4.9 acres.
Who is building it?
The applicant is Veera Venkata Siva Nagesh Polu.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Anantavaram, Thullur, Guntur, Andhra Pradesh.
How big is it?
It has a stated cost of ₹36 lakh and a site of 4.9 acres.
When was it filed?
The application was filed on 31 Aug 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Sri Polu Narasaiah
Project details
| Status | More information requested |
|---|---|
| Status since | 15 Oct 2026 |
| Application filed | 31 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Mining |
| Applicant | Veera Venkata Siva Nagesh Polu |
| Land area | 4.9 acres (2 ha) |
| Project cost | ₹36 lakh |
| Village / locality | Anantavaram |
| Taluk / tehsil | Thullur |
| District | Guntur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03760 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Amendment filed 30 Oct 2026 | Under environmental review | 4.9 acres | ₹36 lakh |
| Amendment filed 31 Aug 2026 (this page) | More information requested | 4.9 acres | ₹36 lakh |
In context
164 applications in Guntur since January 2022 are in the same category (Mining): 104 approved, 16 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 4.9 acres, this one is larger than 59% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 68.6 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 8 mining leases have applied within 5 km.
Where it is
Anantavaram, Thullur, Guntur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Polu Narasaiah — under environmental review, 0 m away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — environmental approval granted, 200 m away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — lapsed, 200 m away
- 6.00 Hect. of Road Metal & Gravel Quarry of Sri Kurra Jogeswara Rao, Sy. No.… — environmental approval granted, 350 m away
- 10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary… — environmental approval granted, 350 m away
- 10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary… — cleared for impact study, 350 m away
- 6.00 Hect. of Road Metal & Gravel Quarry of Sri Kurra Jogeswara Rao, Sy. No.… — cleared for impact study, 350 m away
- 4.650 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — environmental approval granted, 400 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.