Quick answers
What is Sri Vytla Srinivasu – 4.520 Ha?
Sri Vytla Srinivasu – 4.520 Ha is an approved mining project in Anantavaram, Thullur, Guntur, Andhra Pradesh. The site covers 11.2 acres.
Who is building it?
The applicant is Vytla Srinivasu.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 28 Oct 2025), as of 27 Nov 2026.
Where is it?
In Anantavaram, Thullur, Guntur, Andhra Pradesh.
How big is it?
It has a stated cost of ₹40 lakh and a site of 11.2 acres.
When was it filed?
The application was filed on 13 Oct 2025.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 28 Oct 2025 |
| Application filed | 13 Oct 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Vytla Srinivasu |
| Land area | 11.2 acres (4.5 ha) |
| Project cost | ₹40 lakh |
| Village / locality | Anantavaram |
| Taluk / tehsil | Thullur |
| District | Guntur |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03373 |
In context
164 applications in Guntur since January 2022 are in the same category (Mining): 104 approved, 16 filed or under review, and 44 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 11.2 acres, this one is larger than 83% of them.
No other mining lease on record is within 500 m of this site; 8 have applied within 5 km.
Where it is
Anantavaram, Thullur, Guntur, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sri Polu Narasaiah — under environmental review, 650 m away
- Sri Polu Narasaiah — more information requested, 650 m away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — environmental approval granted, 800 m away
- 4.60 Hect. of Morrum/Gravel, Ordinary Earth & Road Metal, Ballast Quarry of… — lapsed, 800 m away
- 6.00 Hect. of Road Metal & Gravel Quarry of Sri Kurra Jogeswara Rao, Sy. No.… — environmental approval granted, 850 m away
- 6.00 Hect. of Road Metal & Gravel Quarry of Sri Kurra Jogeswara Rao, Sy. No.… — cleared for impact study, 850 m away
- 10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary… — environmental approval granted, 950 m away
- 10.500 hectares of Building Stone, Manufactured Sand, Morrum/Gravel & Ordinary… — cleared for impact study, 950 m away
More from Vytla Srinivasu in Guntur
- Sri Vytla Srinivasu – 1.205 Ha — environmental approval granted
- 12.50 Ha. of Road Metal and Gravel Quarry of Sri Vytla Srinivasu, Sy. No.… — environmental approval granted
- 12.50 Ha. of Road Metal and Gravel Quarry of Sri Vytla Srinivasu, Sy. No.… — cleared for impact study
- 12.50 Ha. of Road Metal and Gravel Quarry of Sri Vytla Srinivasu, Sy. No.… — withdrawn
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.