Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 9 Jul 2026 |
| Application filed | 14 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Waste management |
| Applicant | Safenviron Private Limited |
| Land area | 1.5 acres (0.6 ha) |
| Project cost | ₹1.8 crore |
| Village / locality | Kadimpothavaram |
| Taluk / tehsil | G.Konduru |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03359 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 14 Jul 2025 (this page) | Environmental approval granted | 1.5 acres | ₹1.8 crore |
| Early planning filed 20 Apr 2024 | Cleared for impact study | 1.5 acres | ₹1.8 crore |
In context
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kadimpothavaram, G.Konduru, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Relocation of Common Bio medical Waste Treatment Facility by Safenviron… — cleared for impact study, 0 m away
- Submission for EC Corrigendum by M/s. Srinija Drugs Private Limited situated… — environmental approval granted, 350 m away
- Submisson for EC Amendment by Srinija Drugs Pvt. Ltd. situated at Plot No.:… — not approved, 350 m away
- Project by M/s. Srinija Drugs Pvt. Ltd., — initial checks, 350 m away
- Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing… — under environmental review, 550 m away
- Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing… — environmental approval granted, 550 m away
- Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing… — cleared for impact study, 550 m away
- Request for surrendering of Environmental Clearance granted for 368.144 MW… — lapsed, 800 m away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.