What is Developing? Open the mapMap

Cleared for impact studyIndustry · Ntr, Andhra Pradesh

Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing unit from Production capacity 129.0 TPM to 159.0 TPM by Orch Laboratories India Pvt. Ltd. within the existing area of 8482.4 Sqm located at Plot No's.: 51-A to J & 56-F, IDA-Kondapalli, Kondapally Village, Ibrahimpatnam Mandal, NTR District – 521 228, Andhra Pradesh State

Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing unit from Production capacity 129.0 TPM to 159.0 TPM by Orch Laboratories India Pvt. Ltd. within the existing area of 8482.4 Sqm located at Plot No's.: 51-A to J & 56-F, IDA-Kondapalli, Kondapally Village, Ibrahimpatnam Mandal, NTR District – 521 228, Andhra Pradesh State is a proposed industrial project in Kavuluru, G.Konduru, Ntr, Andhra Pradesh. The site covers 2.1 acres. Its stated project cost is ₹38 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 25 Apr 2026).

See it on the live map All projects in Ntr

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

One of 3 filings for this project. The project's main page, with every filing and where each stands: Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing unit from…

Project details

StatusCleared for impact study
Status since25 Apr 2026
Application filed6 Mar 2026
Approval soughtEnvironmental approval
Application typeEarly planning
SectorIndustry
ApplicantOrch Laboratories India Private Limited
Land area2.1 acres (0.9 ha)
Project cost₹38 crore
Village / localityKavuluru
Taluk / tehsilG.Konduru
DistrictNtr
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04274

All filings for this project

This project has 3 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
Amendment filed 16 Nov 2026Under environmental review2.1 acres₹38 crore
Expansion filed 4 Aug 2026Environmental approval granted2.1 acres₹38 crore
Early planning filed 6 Mar 2026 (this page)Cleared for impact study2.1 acres₹38 crore

In context

40 applications in Ntr since January 2022 are in the same category (Industry): 20 approved, 7 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 2.1 acres, this one is smaller than 92% of them.

13 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kavuluru, G.Konduru, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

All 3 Orch Laboratories projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.