Project details
| Official title | Request for surrendering of Environmental Clearance granted for 368.144 MW Combined Cycle Power Plant (Phase-I) for Lanco Kondapalli Power Limited established at Kondapalli village, Ibrahimpatnam Mandal, NTR District, Andhra Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 27 Sept 2026 |
| Application filed | 21 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Other |
| Sector | Power |
| Applicant | Lanco Kondapalli Power Limited |
| Land area | 20.3 acres (8.2 ha) |
| Project cost | ₹77 lakh |
| Village / locality | Kadim Potavaram |
| Taluk / tehsil | G.Konduru |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03681 |
In context
15 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kadim Potavaram, G.Konduru, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Submission for EC Corrigendum by M/s. Srinija Drugs Private Limited situated… — environmental approval granted, 700 m away
- Submisson for EC Amendment by Srinija Drugs Pvt. Ltd. situated at Plot No.:… — not approved, 700 m away
- Project by M/s. Srinija Drugs Pvt. Ltd., — initial checks, 700 m away
- Relocation of Common Bio medical Waste Treatment Facility by Safenviron… — environmental approval granted, 800 m away
- Relocation of Common Bio medical Waste Treatment Facility by Safenviron… — cleared for impact study, 800 m away
- Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing… — under environmental review, 1.3 km away
- Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing… — environmental approval granted, 1.3 km away
- Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing… — cleared for impact study, 1.3 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.