What is Building project by M/s. 3F INDUSTRIES LIMITED?
This proposed building project by M/s. 3F INDUSTRIES LIMITED is in Ipuru, Muthukur, Nellore, Andhra Pradesh. The site covers 30 acres.
Who is building it?
The applicant is 3f Industries Limited.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Ipuru, Muthukur, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹497.9 crore and a site of 30 acres.
When was it filed?
The application was filed on 22 Aug 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 30 Oct 2026 |
| Application filed | 22 Aug 2026 |
| Approval sought | Environmental approval |
| Application type | Expansion |
| Sector | Buildings & townships |
| Applicant | 3f Industries Limited |
| Land area | 30 acres (12.2 ha) |
| Project cost | ₹497.9 crore |
| Village / locality | Ipuru |
| Taluk / tehsil | Muthukur |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03909 |
In context
11 applications in Nellore since January 2022 are in the same category (Buildings & townships): 8 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 30 acres, this one is smaller than 73% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ipuru, Muthukur, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NEW INDUSTRIAL SHED FOR REFINING, PROCESSING, MANUFACTURING, PACKAGING… — environmental approval granted, 1.6 km away
- Industrial project by M/s. Transworld Furtichem Limited — environmental approval granted, 9.5 km away
- Industrial project by Vishwa Samudra Bio Energy Private Limited — environmental approval granted, 9.7 km away
- Industrial project by Vishwa Samudra Bio Energy Private Limited — cleared for impact study, 9.7 km away
- Sri Damodaram Sanjeevaiah Thermal Power Station (SDSTPS) Stage-I (2x800 MW) &… — returned to applicant, 11.4 km away
- CRZ Clearance for Fishing Jetty and Landing Centre at Nelaturu, Muthukuru… — coastal clearance granted, 11.9 km away
- Power project by SEIL Energy India Limited — environmental approval granted, 12.1 km away
- SEIL Energy India Limited Project-2 — environmental approval granted, 14.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.