Quick answers
What is this project?
Sri Damodaram Sanjeevaiah Thermal Power Station (SDSTPS) Stage-I (2x800 MW) & Stage-II (1x800 MW) under operation - EC Amendment for Ash pond is a proposed power project in Painampuram, Muthukur, Nellore, Andhra Pradesh. The site covers 100 acres.
Who is building it?
The applicant is Andhra Pradesh Power Development Company Limited ( a Subsidiary of Andhra Pradesh Power Generation Corporation Limited).
Has it been approved?
Not yet. The application is still under review: its status is “Returned to applicant”, as of 27 Nov 2026.
Where is it?
In Painampuram, Muthukur, Nellore, Andhra Pradesh.
How big is it?
It has a stated cost of ₹5.6 crore and a site of 100 acres.
When was it filed?
The application was filed on 21 Jul 2025.
Project details
| Status | Returned to applicant |
|---|---|
| Status since | 26 Aug 2025 |
| Application filed | 21 Jul 2025 |
| Approval sought | Environmental approval |
| Application type | Amendment |
| Sector | Power |
| Applicant | Andhra Pradesh Power Development Company Limited ( a Subsidiary of Andhra Pradesh Power Generation Corporation Limited) |
| Land area | 100 acres (40.5 ha) |
| Project cost | ₹5.6 crore |
| Village / locality | Painampuram |
| Taluk / tehsil | Muthukur |
| District | Sri Potti Sriramulu Nellore (Nellore) |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-02868 |
In context
7 applications in Nellore since January 2022 are in the same category (Power): 4 approved, 1 filed or under review, and 2 withdrawn, lapsed or rejected.
3 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Painampuram, Muthukur, Nellore, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Power project by SEIL Energy India Limited — environmental approval granted, 3 km away
- SEIL Energy India Limited Project-2 — environmental approval granted, 3.5 km away
- CRZ Clearance for Fishing Jetty and Landing Centre at Nelaturu, Muthukuru… — coastal clearance granted, 4.4 km away
- Building project by M/s. 3F INDUSTRIES LIMITED — under environmental review, 11.4 km away
- NEW INDUSTRIAL SHED FOR REFINING, PROCESSING, MANUFACTURING, PACKAGING… — environmental approval granted, 13 km away
- Industrial project by M/s. Transworld Furtichem Limited — environmental approval granted, 16.2 km away
- Residential Apartment Building Construction Project - DSR Infrastructure… — environmental approval granted, 16.3 km away
- Hotel Building construction project at Survey Nos. 1189 and 1190/4, Nellore… — environmental approval granted, 16.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.