Quick answers
What is this project?
This approved mining project by M/s Sri Sri Sri Gangamma Thalli Stone Crusher is in Munchingipattu, Munchingi Puttu, Alluri Sitharama Raju, Andhra Pradesh. The site covers 2.5 acres.
Who is building it?
The applicant is Janni Jagannadham.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 22 Apr 2026), as of 27 Nov 2026.
Where is it?
In Munchingipattu, Munchingi Puttu, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹35 lakh and a site of 2.5 acres.
When was it filed?
The application was filed on 8 Mar 2026.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 22 Apr 2026 |
| Application filed | 8 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Janni Jagannadham |
| Land area | 2.5 acres (1 ha) |
| Project cost | ₹35 lakh |
| Village / locality | Munchingipattu |
| Taluk / tehsil | Munchingi Puttu |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-03938 |
In context
44 applications in Alluri Sitharama Raju since January 2022 are in the same category (Mining): 35 approved, 3 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 2.5 acres, this one is smaller than 100% of them.
No other mining lease on record has applied within 5 km of this site.
Where it is
Munchingipattu, Munchingi Puttu, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Development of Water Aerodrome at Jalaput Lake, Andhra Pradesh — cleared for impact study, 5.2 km away
- Formation of Road from Laxmipuram to Padalaputtu of Munchingiputtu Mandal — lapsed, 10.9 km away
- Road from O-R&b at Gullelu to Kandrangu (Kondru) of Pedabayalu mandal — lapsed, 32.4 km away
- Road From Maddigaruvu to Kandrangu — lapsed, 36.1 km away
- Kum, Budimela Nookalamma — lapsed, 47.8 km away
- Laying of Iron Ore Pipeline for Pelletization Plant Through Forest Areas of… — in-principle approval, conditions pending, 49.3 km away
- Chittamvalasa Pumped Storage Hydro-Electric Project (800 MW) — cleared for impact study, 50.9 km away
- Sri Madakam Thamnna Dora — environmental approval granted, 51.5 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.