Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Apr 2026 |
| Application filed | 25 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Chaitanya Granite Metal Works |
| Land area | 9 acres (3.6 ha) |
| Project cost | ₹50 lakh |
| Village / locality | Kadim Potavaram |
| Taluk / tehsil | G.Konduru |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04441 |
In context
243 applications in Ntr since January 2022 are in the same category (Mining): 182 approved, 31 filed or under review, and 30 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 9 acres, this one is smaller than 56% of them.
2 other mining leases have applied within 500 m of this site; together with this one they cover 20.8 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 4 mining leases have applied within 5 km.
Where it is
Kadim Potavaram, G.Konduru, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Grant of Quarry Lease for Road Metal Over an… — under forest review, 350 m away
- Diversion of Forest Land Over an Extent of 2.429 Ha in Sy No 1 of Kondapalli… — under forest review, 350 m away
- Diversion of Forest Land for Grant of Quarry Lease for Road Metal Over an… — lapsed, 350 m away
- Diversion of Forest Land Over an Extent of 2.429 Ha in Sy No 1 of Kondapalli… — lapsed, 350 m away
- Mining project by M/s Srinivasa Edifice Pvt Ltd — withdrawn, 1.2 km away
- Request for surrendering of Environmental Clearance granted for 368.144 MW… — lapsed, 1.8 km away
- Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing… — under environmental review, 1.9 km away
- Proposed expansion of existing Bulk drugs & Drug Intermediates manufacturing… — environmental approval granted, 1.9 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.