One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of Forest Land Over an Extent of 2.429 Ha in Sy No 1 of Kondapalli Village,…
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Sept 2024 |
| Application filed | 15 Mar 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Vengamamba Eng Co |
| Land area | 6 acres (2.4 ha) |
| Forest land | 6 acres (2.4 ha) |
| Project cost | ₹30 lakh |
| Village / locality | Kadim Potavaram |
| Taluk / tehsil | G.Konduru |
| District | Ntr |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04949 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Renewal filed 21 Nov 2024 | Under forest review | 6 acres | ₹30 lakh |
| New project filed 15 Mar 2024 (this page) | Lapsed | 6 acres | ₹30 lakh |
In context
15 applications in Ntr since January 2022 are in the same category (Buildings & townships): 9 approved, 2 filed or under review, and 4 withdrawn, lapsed or rejected. The approved ones took a median of 2 months from filing to approval. At 6 acres, this one is larger than 67% of them.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Kadim Potavaram, G.Konduru, Ntr, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Forest Land for Grant of Quarry Lease for Road Metal Over an… — under forest review, 0 m away
- Diversion of Forest Land Over an Extent of 2.429 Ha in Sy No 1 of Kondapalli… — under forest review, 0 m away
- Diversion of Forest Land for Grant of Quarry Lease for Road Metal Over an… — lapsed, 0 m away
- Mining project by M/s Chaitanya Granite Metal Works — lapsed, 350 m away
- Mining project by M/s Srinivasa Edifice Pvt Ltd — withdrawn, 1.6 km away
- Request for surrendering of Environmental Clearance granted for 368.144 MW… — lapsed, 1.7 km away
- Relocation of Common Bio medical Waste Treatment Facility by Safenviron… — environmental approval granted, 2 km away
- Relocation of Common Bio medical Waste Treatment Facility by Safenviron… — cleared for impact study, 2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.