Quick answers
What is this project?
Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to Km-84.123) in connection with the Construction of Kottavalasa - Koraput Doubling Project is a lapsed railway project in Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh. The site covers 82.6 acres.
Who is building it?
The applicant is Ministry of Railway.
Has it been approved?
No. The application was lapsed on 26 Dec 2024, so it is no longer under consideration.
Where is it?
In Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹2,499.7 crore; a site of 82.6 acres and 82.6 acres (33.4 ha) of forest land.
When was it filed?
The application was filed on 19 Nov 2024.
Project details
| Status | Lapsed |
|---|---|
| Status since | 26 Dec 2024 |
| Application filed | 19 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Ministry of Railway |
| Land area | 82.6 acres (33.4 ha) |
| Forest land | 82.6 acres (33.4 ha) |
| Project cost | ₹2,499.7 crore |
| Village / locality | Reserved Forest |
| Taluk / tehsil | Ananthagiri |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04611 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 19 Nov 2024 (this page) | Lapsed | 82.6 acres | ₹2,499.7 crore |
| New project filed 10 Feb 2023 | Lapsed | 82.6 acres | ₹2,499.7 crore |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to… — lapsed, 0 m away
- Doubling Railway Project between Boddavara - Karakavalasa (From Km-33.254 to… — more information requested, 1.9 km away
- Rehabilitation and Upgradation to 2-Lane With Paved Shoulder Configuration of… — under forest review, 2.4 km away
- Sri. Suprakash Das (Formerly Smt. Das Chinnammi) — environmental approval granted, 5.5 km away
- Diversion of 0.28Ha of Forest Land at Borra Reserve Forest Land in Ananthagiri… — lapsed, 6.1 km away
- Adventure Tourism Project in Comp No. 475 of Borra Reserved Forest in… — lapsed, 6.2 km away
- Road from VAA Road to Gunapadu via Mettapalem, Senagapadu and Chittampadu of… — in-principle approval, conditions pending, 7.2 km away
- Diversion of 0.28 Ha forest land for the Establishment of Adventure Tourism… — lapsed, 7.9 km away
More from Ministry of Railway in Alluri Sitharama Raju
- New BG line between Kothagudem-Kirandul — forest land use approved
- Doubling Railway Project between Boddavara - Karakavalasa (From Km-33.254 to… — more information requested
4 Ministry of Railway projects in Alluri Sitharama Raju
All 149 Ministry of Railway projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.