Quick answers
What is this project?
Doubling Railway Project between Boddavara - Karakavalasa (From Km-33.254 to Km -84.123) in connection with the construction of Doubling between Kottavalasa - Koraput(189.278Km.) Railway Project of East Coast Railway, WAT Division, Visakhapatnam is a proposed railway project in Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh. The site covers 1,333.9 acres.
Who is building it?
The applicant is Ministry of Railway.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh.
How big is it?
It has a stated cost of ₹5,999.7 crore; a site of 1,333.9 acres and 234.8 acres (95 ha) of forest land.
When was it filed?
The application was filed on 24 Jul 2025.
Project details
| Status | More information requested |
|---|---|
| Status since | 28 May 2026 |
| Application filed | 24 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Ministry of Railway |
| Land area | 1,333.9 acres (539.8 ha) |
| Forest land | 234.8 acres (95 ha) |
| Project cost | ₹5,999.7 crore |
| Village / locality | Reserved Forest |
| Taluk / tehsil | Ananthagiri |
| District | Alluri Sitharama Raju |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04701 |
In context
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to… — lapsed, 1.9 km away
- Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to… — lapsed, 1.9 km away
- Rehabilitation and Upgradation to 2-Lane With Paved Shoulder Configuration of… — under forest review, 4.1 km away
- Diversion of 0.28Ha of Forest Land at Borra Reserve Forest Land in Ananthagiri… — lapsed, 4.4 km away
- Adventure Tourism Project in Comp No. 475 of Borra Reserved Forest in… — lapsed, 4.4 km away
- Sri. Suprakash Das (Formerly Smt. Das Chinnammi) — environmental approval granted, 4.8 km away
- Diversion of Forest land of extent 0.25Ha for establishment of Adventure… — lapsed, 7.8 km away
- Diversion of Forest land of extent 0.74Ha for establishment of Adventure… — lapsed, 7.8 km away
More from Ministry of Railway in Alluri Sitharama Raju
- New BG line between Kothagudem-Kirandul — forest land use approved
- Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to… — lapsed
- Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to… — lapsed
4 Ministry of Railway projects in Alluri Sitharama Raju
All 149 Ministry of Railway projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.