What is Developing? Open the mapMap

LapsedRailways & metro · Alluri Sitharama Raju, Andhra Pradesh

Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to Km-84.123) in connection with the Construction of Kottavalasa - Koraput Doubling Project

Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to Km-84.123) in connection with the Construction of Kottavalasa - Koraput Doubling Project is a lapsed railway project in Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh. The site covers 82.6 acres. Its stated project cost is ₹2,499.7 crore. As of 27 Nov 2026, its status is “Lapsed” (since 18 Jul 2023).

See it on the live map All projects in Alluri Sitharama Raju

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to Km-84.123) in connection with the Construction of Kottavalasa - Koraput Doubling Project is a lapsed railway project in Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh. The site covers 82.6 acres.

Who is building it?

The applicant is Ministry of Railway.

Has it been approved?

No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.

Where is it?

In Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh.

How big is it?

It has a stated cost of ₹2,499.7 crore; a site of 82.6 acres and 104.9 acres (42.4 ha) of forest land.

When was it filed?

The application was filed on 10 Feb 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Doubling Railway Project between Baddabara - Karakavalasa (from Km-33.254 to Km-84.123)…

Project details

StatusLapsed
Status since18 Jul 2023
Application filed10 Feb 2023
Approval soughtForest land use
Application typeNew project
SectorRailways & metro
ApplicantMinistry of Railway
Land area82.6 acres (33.4 ha)
Forest land104.9 acres (42.4 ha)
Project cost₹2,499.7 crore
Village / localityReserved Forest
Taluk / tehsilAnanthagiri
DistrictAlluri Sitharama Raju
StateAndhra Pradesh
Location fromSite boundary on record
Our referenceWID-AP-04620

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 19 Nov 2024Lapsed82.6 acres₹2,499.7 crore
New project filed 10 Feb 2023 (this page)Lapsed82.6 acres₹2,499.7 crore

In context

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Reserved Forest, Ananthagiri, Alluri Sitharama Raju, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ministry of Railway in Alluri Sitharama Raju

4 Ministry of Railway projects in Alluri Sitharama Raju
All 149 Ministry of Railway projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.