What is this project?
Bsnl 4g Saturation Project_pudirayadoruvu_tirupati_andhra Pradesh is a lapsed project in Pudilayadoruvu, Vakadu, Tirupati, Andhra Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Mahesh Nair.
Has it been approved?
No. The application was lapsed on 16 Jan 2024, so it is no longer under consideration.
Where is it?
In Pudilayadoruvu, Vakadu, Tirupati, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore; a site of 0 acres and 200 m² of forest land.
When was it filed?
The application was filed on 10 Oct 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Bsnl 4g Saturation Project_pudirayadoruvu_tirupati_andhra Pradesh
Project details
| Status | Lapsed |
|---|---|
| Status since | 16 Jan 2024 |
| Application filed | 10 Oct 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Other |
| Applicant | Mahesh Nair |
| Land area | 200 m² |
| Forest land | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Pudilayadoruvu |
| Taluk / tehsil | Vakadu |
| District | Tirupati |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-04708 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 10 Oct 2023 (this page) | Lapsed | 0 acres | ₹1 crore |
| New project filed 9 Oct 2023 | More information requested | 0 acres | ₹1 crore |
In context
10 applications in Tirupati since January 2022 are in the same category (Other): 2 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pudilayadoruvu, Vakadu, Tirupati, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project_pudirayadoruvu_tirupathi_andhra Pradesh — decision issued, 0 m away
- Bsnl 4g Saturation Project_pudirayadoruvu_tirupati_andhra Pradesh — more information requested, 0 m away
- Environmental Impact Assessment Study for Opening Sea Mouth into Pulicat Lake — coastal clearance granted, 2.6 km away
- Shoreline Protection using Nature Based Solution & Construction of Jetty for… — under wildlife review, 5 km away
- Shore Protection Using Nature Based Solution and Construction of Jetty for… — more information requested, 5 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mallam and Chittamuru… — under wildlife review, 11.8 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mallam-Chittamuru… — under wildlife review, 11.8 km away
- Smt. Veluru Leelavathamma(Gravel-0.910 Ha) — environmental approval granted, 28.8 km away
More from Mahesh Nair in Tirupati
- Bsnl 4g Saturation Project_irakam_tirupati_andhra Pradesh — more information requested
- Bsnl 4g Saturation Project_irakam_tirupati_andhra Pradesh — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.