Quick answers
What is this project?
Shore Protection Using Nature Based Solution and Construction of Jetty for Crew Module Recovery and Transportation of Stage Components is a proposed port and coastal project in Na, Vakadu, Tirupati, Andhra Pradesh. The site covers 5.6 acres.
Who is building it?
The applicant is Central Public Works Department.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Na, Vakadu, Tirupati, Andhra Pradesh.
How big is it?
It has a stated cost of ₹110 crore and a site of 5.6 acres.
When was it filed?
The application was filed on 3 Sept 2024.
Project details
| Status | More information requested |
|---|---|
| Status since | 3 Sept 2024 |
| Application filed | 3 Sept 2024 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Ports & coast |
| Applicant | Central Public Works Department |
| Land area | 5.6 acres (2.3 ha) |
| Project cost | ₹110 crore |
| Village / locality | Na |
| Taluk / tehsil | Vakadu |
| District | Tirupati |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05086 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Na, Vakadu, Tirupati, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Shoreline Protection using Nature Based Solution & Construction of Jetty for… — under wildlife review, 0 m away
- Environmental Impact Assessment Study for Opening Sea Mouth into Pulicat Lake — coastal clearance granted, 3 km away
- Bsnl 4g Saturation Project_pudirayadoruvu_tirupathi_andhra Pradesh — decision issued, 5 km away
- Bsnl 4g Saturation Project_pudirayadoruvu_tirupati_andhra Pradesh — lapsed, 5 km away
- Bsnl 4g Saturation Project_pudirayadoruvu_tirupati_andhra Pradesh — more information requested, 5 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mallam and Chittamuru… — under wildlife review, 16.4 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mallam-Chittamuru… — under wildlife review, 16.4 km away
- Bsnl 4g Saturation Project_irakam_tirupati_andhra Pradesh — decision issued, 26.5 km away
More from Central Public Works Department in Tirupati
- Shoreline Protection using Nature Based Solution & Construction of Jetty for… — under wildlife review
All 26 Central Public Works Department projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.