Quick answers
What is this project?
Bsnl 4g Saturation Project_pudirayadoruvu_tirupathi_andhra Pradesh is a project in Pudilayadoruvu, Vakadu, Tirupati, Andhra Pradesh. The site covers 0 acres.
Who is building it?
The applicant is Bharat Sanchar Nigam Limited.
Has it been approved?
Yes. Its status is “Decision issued” (since 28 Oct 2023), as of 27 Nov 2026.
Where is it?
In Pudilayadoruvu, Vakadu, Tirupati, Andhra Pradesh.
How big is it?
It has a stated cost of ₹1 crore and a site of 0 acres.
When was it filed?
The application was filed on 28 Oct 2023.
Project details
| Status | Decision issued |
|---|---|
| Status since | 28 Oct 2023 |
| Application filed | 28 Oct 2023 |
| Approval sought | Wildlife review |
| Application type | New project |
| Sector | Other |
| Applicant | Bharat Sanchar Nigam Limited |
| Land area | 200 m² |
| Project cost | ₹1 crore |
| Village / locality | Pudilayadoruvu |
| Taluk / tehsil | Vakadu |
| District | Tirupati |
| State | Andhra Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-AP-05052 |
In context
10 applications in Tirupati since January 2022 are in the same category (Other): 2 approved, 4 filed or under review, and 2 withdrawn, lapsed or rejected. At 0 acres, this one is smaller than 100% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pudilayadoruvu, Vakadu, Tirupati, Andhra Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bsnl 4g Saturation Project_pudirayadoruvu_tirupati_andhra Pradesh — lapsed, 0 m away
- Bsnl 4g Saturation Project_pudirayadoruvu_tirupati_andhra Pradesh — more information requested, 0 m away
- Environmental Impact Assessment Study for Opening Sea Mouth into Pulicat Lake — coastal clearance granted, 2.6 km away
- Shoreline Protection using Nature Based Solution & Construction of Jetty for… — under wildlife review, 5 km away
- Shore Protection Using Nature Based Solution and Construction of Jetty for… — more information requested, 5 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mallam and Chittamuru… — under wildlife review, 11.8 km away
- Laying of Under Ground Optical Fibre Cable (OFC) between Mallam-Chittamuru… — under wildlife review, 11.8 km away
- Smt. Veluru Leelavathamma(Gravel-0.910 Ha) — environmental approval granted, 28.8 km away
More from Bharat Sanchar Nigam Limited in Tirupati
- Bsnl 4g Saturation Project_irakam_tirupati_andhra Pradesh — decision issued
All 1,001 Bharat Sanchar Nigam (BSNL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.